Table T4. Breakdown of operational time while on site during Expedition 302 (ACEX).
Date (2004)
|
Time (h)
|
Comments
|
T
|
P
|
D
|
W
|
B
|
TR
|
Total
|
15 Aug
|
8.50
|
2.50
|
|
|
2.00
|
|
13
|
Chicksan valve broken
|
16 Aug
|
6.00
|
|
|
5.00
|
13.00
|
|
24
|
XCB lost
|
17 Aug
|
|
|
|
|
24.00
|
|
24
|
BHA lost; chicksan valve broken
|
18 Aug
|
|
|
|
13.00
|
11.00
|
|
24
|
Repair of chicksan valve
|
19 Aug
|
|
|
9.58
|
|
14.42
|
|
24
|
|
20 Aug
|
|
|
22.83
|
1.17
|
|
|
24
|
|
21 Aug
|
|
|
15.83
|
8.17
|
|
|
24
|
|
22 Aug
|
|
|
24.00
|
|
|
|
24
|
|
23 Aug
|
|
|
10.00
|
14.00
|
|
|
24
|
|
24 Aug
|
9.50
|
1.00
|
|
10.00
|
|
3.50
|
24
|
|
25 Aug
|
10.67
|
1.00
|
1.00
|
|
11.33
|
|
24
|
Iron roughneck failed; reflective seismics (D)
|
26 Aug
|
|
3.50
|
4.25
|
|
16.25
|
|
24
|
Wireline termination failed
|
27 Aug
|
13.50
|
|
1.50
|
|
1.75
|
7.25
|
24
|
Chicksan valve broken third time
|
28 Aug
|
|
|
21.33
|
|
2.67
|
|
24
|
APC stuck
|
29 Aug
|
|
|
24.00
|
|
|
|
24
|
|
30 Aug
|
|
|
24.00
|
|
|
|
24
|
|
31 Aug
|
|
|
24.00
|
|
|
|
24
|
|
1 Sept
|
4.75
|
5.42
|
11.67
|
1.00
|
1.17
|
|
24
|
|
2 Sept
|
1.83
|
|
2.92
|
|
19.25
|
|
24
|
Logging failed, plugged bit
|
3 Sept
|
|
|
23.08
|
0.92
|
|
|
24
|
|
4 Sept
|
|
5.50
|
12.67
|
|
5.83
|
|
24
|
Equipment frozen
|
5 Sept
|
8.33
|
|
8.75
|
|
6.92
|
|
24
|
APC stuck in BHA
|
6 Sept
|
5.00
|
|
6.50
|
|
8.00
|
4.50
|
24
|
Maintenance of ships; reflective seismics (D)
|
Totals:
|
68.1
|
18.9
|
247.9
|
53.3
|
137.6
|
15.3
|
541
|
|
Percent.
|
12.6
|
3.5
|
45.8
|
9.8
|
25.4
|
2.8
|
|
|
Notes: XCB = extended core barrel, BHA = bottom-hole assembly, APC = advanced piston corer. Approval was given to start running pipe on Site M0001 at 1100 h on 15 August