Figure F68. Operation time vs. penetration depth, Hole U1372A. Major operation milestones are labeled. Dashed line = planned penetration, solid red line = actual penetration. RCB = rotary core barrel, BHA = bottom-hole assembly. Rot. = rotation, ROP = rate of penetration.
Previous | Close | Next | Top of page