Previous   |   Close   |   Next

Figure F70. Operation time vs. penetration depth, Hole U1374A. Major operation milestones are labeled. Dashed line = planned penetration, solid red line = actual penetration. Rot. = rotation, ROP = rate of penetration. FFF = free-fall funnel, BHA = bottom-hole assembly, triple combo = triple combination, GBM = Göttingen Borehole Magnetometer, FMS = Formation MicroScanner, UBI = Ultrasonic Borehole Imager.

Previous   |   Close   |   Next  |  Top of page