Figure F25. Remotely operated vehicle (ROV) video snapshots of the CORK head, showing (A) CORK head and ROV platform as they are lowered through the water column and (B) downloading pressure data from the sensor carrier in the pressure bay of the CORK head after cementing.
Previous | Close | Next | Top of page