Previous   |    Close   |    Next

Table T4. Expedition 335 coring summary.

Core
Top depth drilled
DSF (m)
Bottom depth drilled
DSF (m)
Advanced (m)
Recovered length (m)
Curated length (m)
Top depth cored
CSF (m)
Bottom depth recovered (m)
Recovery
(%)
Date
(2011)
Local time
(h)
Numbers
of sections
335-U1256D-
1G 924.0 932.9 8.9 0.12 0.12 924.0 924.12 1 3 May 2120 1
2G 932.9 942.5 9.6 0.17 0.17 932.9 933.07 2 3 May 2345 1
3G 942.5 952.1 9.6 0.08 0.08 942.5 942.58 1 4 May 0150 1
4G 952.1 961.7 9.6 0.05 0.05 952.1 952.15 1 4 May 0350 1
5G 961.7 971.3 9.6 0.03 0.03 961.7 961.73 0 4 May 0545 1
6G 971.3 980.9 9.6 0.00 0.00 971.3 971.30 0 4 May 1315 0
7W 980.9 1507.1 526.2 0.00 0.00 980.9 980.90 0 5 May 0100 1
235R 1507.1 1511.8 4.7 0.33 0.36 1507.1 1507.47 7 5 May 0815 1
236R 1511.8 1516.5 4.7 0.61 0.63 1511.8 1512.43 13 5 May 1320 1
237R 1516.5 1518.2 1.7 0.00 0.00 1516.5 1516.50 0 5 May 2135 0
238R 1518.2 1520.2 2.0 0.20 0.20 1518.2 1518.00 10 6 May 1330 1
239R 1520.2 1521.6 1.4 0.50 0.53 1520.2 1520.73 36 29 May 1015 1
Totals:
597.6 2.09 2.18           10

Excerpted from LIMS reports.

Previous   |    Close   |    Next   |    Top of page