Table T1. Summary of holes occupied during Expedition 336.

Site Hole Latitude Longitude Seafloor
depth
(mbrf)
Number
of cores
Interval
cored
(m)
Length
recovered
(m)
Percent
recovered
(%)
Section
drilled
without
coring
(m)
Total
penetration
(m)
Total
depth of
hole
(mbrf)
Time
on hole
(h)
Time
on hole
(d)
Number
of holes
Operations conducted
395 395A 22°45.3519′N 46°4.8609′W 4484.0 0 0.0 0.00 0.0 0.0 5084.0 194.00 8.1 Retrieved Leg 174 CORK, logged, installed CORK (failed wellhead)
U1382 U1382A 22°45.3531′N 46°4.8911′W 4494.0 11 100.0 31.79 32 110.0 210.0 4704.0 263.25 11.0 1 Cored basement, logged, installed CORK
U1382B 22°45.3528′N 46°4.8748′W 4494.0 12 98.8 84.28 85 0.0 98.8 4592.8 22.00 0.9 1 Cored sediment and basement contact
Site U1382 totals: 23 198.8 116.07 58 110.0 308.8 285.25 11.9 2  
U1383
(NP-2)
U1383A 22°48.1229′N 46°3.1661′W 4425.2 0 0.0 0.00 36.0 36.0 4461.2 21.75 0.9 1 Jet-in test
U1383B 22°48.1328′N 46°3.1556′W 4425.2 0 0.0 0.00 89.8 89.8 4515.0 152.25 6.3 1 Installed cone and casing; bit lost in hole, 35 m open hole, ROV platform deployed
U1383C 22°48.1241′N 46°3.1662′W 4425.2 31 262.0 50.31 19 69.5 331.5 4756.7 441.50 18.4 1 Cored basement, logged, installed CORK
U1383D 22°48.1316′N 46°3.1628′W 4425.2 7 44.3 48.65 110 0.0 44.3 4469.5 20.50 0.9 1 Cored sediment and basement contact
U1383E 22°48.1283′N 46°3.1582′W 4425.2 7 44.2 50.28 114 0.0 44.2 4469.4 10.25 0.4 1 Cored sediment and basement contact
Site U1383 totals: 45 350.5 149.24 43 195.3 545.8 646.25 26.9 5  
U1384
(NP-1)
U1384A 22°48.7086′N 46°5.3464′W 4475.9 12 96.2 94.09 98 0.0 96.2 4572.1 30.50 1.3 1 Cored sediment and basement contact
Site U1384 totals: 12 96.2 94.09 98 0.0 96.2 30.50 1.3 1  
Expedition 336 totals: 80 645.5 359.40 56 305.3 950.8   962.00 40.11 8  

— = not applicable. CORK = subseafloor borehole observatory. ROV = remotely operated vehicle.