Table T2. Summary of all coring completed during Expedition 348.
Hole | Longitude | Latitude | Water depth (mbsl) | Core | Date/Time on deck (2013; h UTC) |
Depth (mbsf) |
Advanced (m) |
Recovered (m) |
Recovery (%) |
Drilled interval (mbsf) |
Cored interval (m) |
Core recovered (m) | Recovery (%) |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
C0002M | 33°18.0058′N | 136°38.2397′E | 1937.5 | 1R | 21 Sep; 1135 | 475.0 | 9.5 | 5.3 | 56.0 | 475–512.5 | 37.5 | 16.4 | 43.8 |
2R | 21 Sep; 1442 | 484.5 | 9.5 | 4.0 | 44.2 | ||||||||
3R | 21 Sep; 1726 | 493.5 | 9.0 | 2.5 | 26.7 | ||||||||
4R | 21 Sep; 1953 | 503.0 | 9.5 | 4.6 | 48.4 | ||||||||
C0002P | 33°18.0507′N | 136°38.2029′E | 1939.0 | 1R | 23 Dec; 0513 | 2163.0 | 9.5 | 0.4 | 4.2 | 2163–2218.5 | 55.5 | 31.5 | 56.7 |
2R | 23 Dec; 1138 | 2172.5 | 9.5 | 6.1 | 63.7 | ||||||||
3R | 23 Dec; 1842 | 2182.0 | 9.5 | 2.9 | 30.3 | ||||||||
4R | 24 Dec; 0353 | 2191.5 | 9.5 | 8.2 | 86.2 | ||||||||
5R | 24 Dec; 1214 | 2201.0 | 8.0 | 5.5 | 68.8 | ||||||||
6R | 24 Dec; 2015 | 2209.0 | 9.5 | 8.5 | 89.1 |
Previous | Close | Next | Top of page