Table T3. Hole U1301B final formation and casing depth measurements.

Description Official (final) depths (m)
Below rig
floor
Below
seafloor
Into
basement
Below base
of reentry
cone
Formation data:



Seafloor 2667.84 –3.45
Top of cuttings 2666.80 –4.49
Basement 2933.00 265.16 261.71
Hole depth data:



20 inch diameter hole 2936.00 268.16 3.00 264.71
18½ inch diameter hole 2944.00 276.16 11.00 272.71
14¾ inch diameter hole (TD) 3018.00 350.16 85.00 346.71
9⅞ inch diameter drilled hole 3019.00 351.16 86.00 347.71
9⅞ inch diameter cored hole (TD) 3250.60 582.76 317.60 579.31
Reentry cone installation data:



Top (rim) of reentry cone 2668.84 1.00 –2.45
Mud skirt (base) 2671.29 3.45 0.00
Casing shoe data:



20 inch casing shoe 2710.36 42.52 39.07
16 inch casing shoe 2938.77 270.93 5.77 267.48
Bottom of 10¾ inch casing "gap" 2920.17 252.33 –12.83 248.88
Top of 10¾ inch casing "gap" 2926.00 258.16 –7.00 254.71
Original 10¾ inch casing shoe 3013.91 346.07 80.91 342.62
Final 10¾ inch casing shoe 3019.00 351.16 86.00 347.71
Estimated gap in 10¾ inch casing string 5.83


Notes: Negative numbers represent distance above the base of the reentry cone. A 10¾ inch casing coupling backed off between joints number 8 and 9. Bottom of casing "gap" at 2926.0 mbrf documented by numerous tags; shoe depth was calculated from this. Top of 10¾ casing gap at 2920.2 mbrf calculated from casing tally. — = not applicable or meaningful.