Table T1. Site U1316 coring summary.
Hole U1316A |
Latitude: 51°22.5512′N |
Longitude: 11°43.8030′W |
Seafloor (drill pipe measurement from rig floor; mbrf): 959.20 |
Distance between rig floor and sea level (m): 10.8 |
Water depth (drill pipe measurement from sea level; m): 948.4 |
Total depth (from rig floor; mbrf): 1093.2 |
Total penetration (mbsf): 134.0 |
Hole U1316B |
Latitude: 51°22.5512′N |
Longitude: 11°43.8030′W |
Seafloor (drill pipe measurement from rig floor; mbrf): 959.0 |
Distance between rig floor and sea level (m): 10.9 |
Water depth (drill pipe measurement from sea level; m): 948.1 |
Total depth (from rig floor; mbrf): 1018.5 |
Total penetration (mbsf): 59.5 |
Hole U1316C |
Latitude: 51°22.5512′N |
Longitude: 11°43.8030′W |
Seafloor (drill pipe measurement from rig floor; mbrf): 959.0 |
Distance between rig floor and sea level (m): 11.0 |
Water depth (drill pipe measurement from sea level; m): 948.0 |
Total depth (from rig floor; mbrf): 1102.1 |
Total penetration (mbsf): 143.1 |
Core | Date (2005) |
Local time |
Depth (mbsf) | Length (m) | Recovery (%) |
Comment | ||
---|---|---|---|---|---|---|---|---|
Top | Bottom | Cored | Recovered | |||||
307-U1316A- | ||||||||
1-H | 30 Apr | 1120 | 0.0 | 7.3 | 7.3 | 7.33 | 100.41 | |
2-H | 30 Apr | 1220 | 7.3 | 16.8 | 9.5 | 10.04 | 105.68 | |
3-H | 30 Apr | 1315 | 16.8 | 26.3 | 9.5 | 10.13 | 106.63 | Start Tensor 1 at 1220 hr |
4-H | 30 Apr | 1355 | 26.3 | 35.8 | 9.5 | 9.96 | 104.84 | |
5-H | 30 Apr | 1435 | 35.8 | 45.3 | 9.5 | 9.43 | 99.26 | |
6-H | 30 Apr | 1535 | 45.3 | 54.8 | 9.5 | 10.02 | 105.47 | |
7-H | 30 Apr | 1610 | 54.8 | 64.3 | 9.5 | 3.24 | 34.11 | |
8-H | 30 Apr | 1830 | 64.3 | 66.3 | 2.0 | 2.87 | 143.50 | |
9-X | 30 Apr | 1950 | 66.3 | 75.8 | 9.5 | 0.32 | 3.37 | |
10-X | 30 Apr | 2105 | 75.8 | 78.3 | 2.5 | 4.35 | 174.00 | |
11-X | 30 Apr | 2310 | 78.3 | 83.3 | 5.0 | 5.98 | 119.60 | |
12-X | 1 May | 0140 | 83.3 | 87.8 | 4.5 | 2.81 | 62.44 | |
13-X | 1 May | 0355 | 87.8 | 93.8 | 6.0 | 5.91 | 98.50 | |
14-X | 1 May | 0530 | 93.8 | 94.3 | 0.5 | 0.39 | 78.00 | |
15-X | 1 May | 0715 | 94.3 | 99.0 | 4.7 | 1.66 | 35.32 | |
16-X | 1 May | 0915 | 99.0 | 108.6 | 9.6 | 9.92 | 103.33 | |
17-X | 1 May | 1055 | 108.6 | 112.3 | 3.7 | 1.52 | 41.08 | |
18-X | 1 May | 1230 | 112.3 | 118.3 | 6.0 | 9.92 | 165.33 | |
19-X | 1 May | 1420 | 118.3 | 118.8 | 0.5 | 1.68 | 336.00 | |
20-X | 1 May | 1735 | 118.8 | 125.3 | 6.5 | 2.55 | 39.20 | |
21-X | 1 May | 1950 | 125.3 | 134.0 | 8.7 | 7.24 | 83.20 | |
Core totals: | 134.0 | 117.27 | 87.51 | |||||
307-U1316B- | ||||||||
1-H | 2 May | 0845 | 0.0 | 5.5 | 5.5 | 5.50 | 100.00 | |
2-H | 2 May | 0915 | 5.5 | 15.0 | 9.5 | 9.68 | 101.89 | |
3-H | 2 May | 0955 | 15.0 | 24.5 | 9.5 | 9.94 | 104.63 | Start Tensor 1 at 0920 hr |
4-H | 2 May | 1040 | 24.5 | 34.0 | 9.5 | 9.97 | 104.95 | |
5-H | 2 May | 1135 | 34.0 | 43.5 | 9.5 | 9.91 | 104.32 | |
6-H | 2 May | 1220 | 43.5 | 53.0 | 9.5 | 10.02 | 105.47 | |
7-H | 2 May | 1315 | 53.0 | 59.3 | 6.3 | 6.33 | 100.48 | |
8-H | 2 May | 1400 | 59.3 | 59.5 | 0.2 | 0.18 | 90.00 | |
Core totals: | 59.5 | 61.53 | 103.41 | |||||
307-U1316C- | ||||||||
*****Drilled from 0.0 to 40.0 mbsf***** | ||||||||
1-R | 7 May | 0930 | 40.0 | 49.2 | 9.2 | 0.25 | 2.72 | |
2-R | 7 May | 1030 | 49.2 | 58.8 | 9.6 | 4.36 | 45.42 | |
3-R | 7 May | 1150 | 58.8 | 68.4 | 9.6 | 5.10 | 53.12 | |
4-R | 7 May | 1325 | 68.4 | 78.0 | 9.6 | 8.04 | 83.75 | |
5-R | 7 May | 1455 | 78.0 | 87.6 | 9.6 | 6.24 | 65.00 | |
6-R | 7 May | 1600 | 87.6 | 97.2 | 9.6 | 7.77 | 80.94 | |
7-R | 7 May | 1720 | 97.2 | 106.9 | 9.7 | 10.00 | 103.09 | |
8-R | 7 May | 1820 | 106.9 | 116.6 | 9.7 | 8.50 | 87.63 | |
9-R | 7 May | 2000 | 116.6 | 126.2 | 9.6 | 9.93 | 103.44 | |
10-R | 7 May | 2215 | 126.2 | 133.4 | 7.2 | 0.00 | 0.00 | |
11-R | 8 May | 0010 | 133.4 | 143.1 | 9.7 | 9.96 | 102.68 | |
Core totals: | 103.1 | 70.15 | 68.04 |
Close | Next | Top of page