Table T9. Logging operations, Hole U1317D.
Date (May 2005) |
Local time (h) |
Comments |
---|---|---|
6 | 1200 | Hole preparation complete, rig up triple combo (HNGS-APS-HLDS-DIT-EMS-TAP) |
6 | 1415 | Run into hole with triple combo |
6 | 1515 | Uplog with triple combo at 900 ft/h from total depth |
6 | 1600 | Pull tools out of hole and rig down |
6 | 1715 | Rig up WST |
6 | 1740 | Run into hole with WST |
6 | 1830 | Uplog with WST (13 stations) 5 min/station |
6 | 2000 | Pull WST out of hole and rig down |
6 | 2130 | Rig up FMS-sonic (SGT-DSI-GPIT-FMS) |
6 | 2215 | Run into hole with FMS-sonic |
6 | 2315 | First pass with FMS at 900 ft/h from obstruction 251 mbsf |
6 | 2345 | Going down for a main pass to seafloor |
7 | 0000 | Uplog with FMS at 900 ft/h from obstruction |
7 | 0100 | Pull tools out of hole and rig down |
7 | 0200 | Clear rig floor of logging tools, sheaves, and wireline |
7 | 0230 | End of logging operation |
Notes: Drillers total depth = 1076 mbrf, water depth = 806 m, end of pipe = 77 mbsf, total cored depth = 270 mbsf, total logged depth = 251 mbsf. Triple combo = triple combination, HNGS = Hostile Environment Natural Gamma Ray Sonde, APS = Accelerator Porosity Sonde, HLDS = Hostile Environment Litho-Density Sonde, DIT = Dual Induction Tool, EMS = Environmental Measurement Sonde, TAP = Temperature/Acceleration/Pressure tool, WST = Well Seismic Tool, SGT = Scintillation Gamma Ray Tool, DSI = Dipole Sonic Imager, GPIT = General Purpose Inclinometry Tool, FMS = Formation MicroScanner.
Previous | Close | Next | Top of page