Close   |    Next

Table T1. Site U1318 coring summary.

Hole U1318A
Latitude: 51°26.1616′N
Longitude: 11°33.0184′W
Seafloor (drill pipe measurement from rig floor; mbrf): 420.30
Distance between rig floor and sea level (m): 11.0
Water depth (drill pipe measurement from sea level; m): 409.3
Total depth (from rig floor; mbrf): 562.5
Total penetration (mbsf): 142.2
Hole U1318B
Latitude: 51°26.1480′N
Longitude: 11°33.0186′W
Seafloor (drill pipe measurement from rig floor; mbrf): 419.80
Distance between rig floor and sea level (m): 11.0
Water depth (drill pipe measurement from sea level; m): 408.8
Total depth (from rig floor; mbrf): 664.4
Total penetration (mbsf): 244.6
Hole U1318C
Latitude: 51°26.1497′N
Longitude: 11°33.0400′W
Seafloor (drill pipe measurement from rig floor; mbrf): 420.9
Distance between rig floor and sea level (m): 11.0
Water depth (drill pipe measurement from sea level; m): 409.9
Total depth (from rig floor; mbrf): 575.4
Total penetration (mbsf): 154.5
Core Date
(May 2005)
Local
time
Depth (mbsf) Length (m) Recovery
(%)
Comment
Top Bottom Cored Recovered
307-U1318A-
1-H 8 2050 0.0 9.2 9.2 9.20 100.00  
2-H 8 2140 9.2 18.7 9.5 9.94 104.63 Start Tensor 1 at 2145 hr
3-H 8 2305 18.7 28.2 9.5 9.95 104.74  
4-H 8 2350 28.2 37.7 9.5 8.79 92.53  
5-H 9 0020 37.7 47.2 9.5 9.10 95.79  
6-H 9 0125 47.2 56.7 9.5 9.88 104.00 Adara
7-H 9 0200 56.7 66.2 9.5 8.12 85.47  
8-H 9 0235 66.2 75.7 9.5 7.55 79.47  
9-H 9 0330 75.7 85.2 9.5 9.03 95.05  
10-H 9 0405 85.2 94.7 9.5 9.09 95.68  
11-H 9 0440 94.7 104.2 9.5 9.95 104.74  
12-H 9 0535 104.2 113.7 9.5 8.35 87.89  
13-H 9 0620 113.7 123.2 9.5 7.91 83.26  
14-H 9 0725 123.2 132.7 9.5 5.06 53.26  
15-H 9 0755 132.7 142.2 9.5 6.41 67.475 Split liner
Core totals: 142.2 128.33 90.25  
307-U1318B-
1-H 9 1015 0.0 5.0 5.0 5.07 101.40  
2-H 9 1040 5.0 14.5 9.5 9.33 98.21  
3-H 9 1105 14.5 24.0 9.5 9.79 103.05 Start Tensor 1 at 1040 hr
4-H 9 1135 24.0 33.5 9.5 9.32 98.11  
5-H 9 1205 33.5 43.0 9.5 9.78 102.95  
6-H 9 1240 43.0 52.5 9.5 8.43 88.74  
7-H 9 1310 52.5 62.0 9.5 9.46 99.58  
8-H 9 1340 62.0 71.5 9.5 9.31 98.00  
9-H 9 1415 71.5 81.0 9.5 8.16 85.89  
10-H 9 1445 81.0 90.5 9.5 9.15 96.32  
11-H 9 1515 90.5 100.0 9.5 7.73 81.37  
12-H 9 1550 100.0 109.5 9.5 8.42 88.63  
13-H 9 1620 109.5 119.0 9.5 8.35 87.89  
14-H 9 1700 119.0 128.5 9.5 8.44 88.84  
15-X 9 1740 128.5 138.1 9.6 0.00 0.00  
16-X 9 1835 138.1 147.7 9.6 0.13 1.35  
17-X 9 1930 147.7 157.3 9.6 9.85 102.60  
18-X 9 2025 157.3 166.9 9.6 9.83 102.40  
19-X 9 2110 166.9 176.5 9.6 9.94 103.54  
20-X 9 2200 176.5 186.1 9.6 9.94 103.54  
21-X 9 2305 186.1 195.7 9.6 9.51 99.06  
22-X 9 0050 195.7 205.2 9.5 9.93 104.53  
23-X 10 0100 205.2 214.7 9.5 9.88 104.00  
307-U1318B-
24-X 10 0200 214.7 223.7 9.0 9.00 100.00  
25-X 10 0345 223.7 228.3 4.6 4.34 94.35  
26-X 10 0515 228.3 235.0 6.7 3.50 52.24  
27-X 10 0630 235.0 244.6 9.6 6.41 66.77  
Core totals: 244.6 213.00 87.08  
307-U1318C-
1-H 10 2300 0.0 2.9 2.9 2.94 101.38  
*****Drilled from 2.9 to 70.0 mbsf*****    
2-H 11 0150 70.0 79.5 9.5 9.19 96.74 Tensor 1 started at 0115 hr
3-H 11 0230 79.5 89.0 9.5 9.78 102.95  
4-H 11 0310 89.0 98.5 9.5 8.63 90.84  
5-H 11 0355 98.5 108.0 9.5 8.35 87.89  
6-H 11 0430 108.0 117.5 9.5 7.58 79.79  
7-H 11 0510 117.5 125.7 8.2 8.14 99.27  
8-X 11 0640 125.7 135.3 9.6 9.75 101.56  
9-X 11 0710 135.3 144.9 9.6 9.92 103.33  
10-X 11 0745 144.9 154.5 9.6 9.87 102.81  
Core totals: 87.4 84.15 96.28  