Table T11. Logging operations, Hole U1318A.

Date
(May 2005)
Local
time (h)
Comments
10 1030 Hole preparation complete, rig up triple combo (HNGS-APS-HLDS-DIT-EMS-TAP)
10 1130 Run into hole with triple combo
10 1310 Uplog with triple combo at 900 ft/h from total depth
10 1350 Pull tools out of hole and rig down
10 1515 Rig up FMS-sonic (SGT-DSI-GPIT-FMS)
10 1600 Run into hole with FMS-sonic
10 1705 First pass with FMS at 900 ft/h from total depth
10 1740 Going down for main pass to seafloor
10 1755 Uplog with FMS at 900 ft/h from total depth
10 1855 Pull tools out of hole and rig down
10 2000 Clear rig floor of logging tools, sheaves, and wireline
10 2100 End of logging operation

Notes: Drillers total depth = 664 mbrf, water depth = 409 m, end of pipe = 70 mbsf, total cored depth = 242 mbsf, total logged depth = 242 mbsf. HNGS = Hostile Environment Natural Gamma Ray Sonde, APS = Accelerator Porosity Sonde, HLDS = Hostile Environment Litho-Density Sonde, DIT = Dual Induction Tool, EMS = Environmental Measurement Sonde, TAP = Temperature/​Acceleration/​Pressure tool, WST = Well Seismic Tool, SGT = Scintillation Gamma Ray Tool, DSI = Dipole Sonic Imager, GPIT = General Purpose Inclinometry Tool, FMS = Formation MicroScanner.

Previous   |    Close   |    Top of page