Table T17. T2P Deployment 17, Hole U1322B.
Event | Time (GMT) |
Description |
---|---|---|
1 | 18:39:55 | Data logger started at 1 Hz |
2 | 20:10:31 | T2P on rig floor |
3 | 20:22:12 | Start lowering T2P downhole, pumps on |
4 | 20:29:54 | Stop at 491 mbsl, pumps off |
5 | 20:31:58 | Start lowering probe |
6 | 20:35:04 | Stop at 741 mbsl, pumps off |
7 | 20:37:04 | Start lowering probe |
8 | 20:43:20 | Stop at 1321 mbsl, pumps off |
9 | 20:46:30 | Start lowering probe |
10 | 20:48:58 | Stop at 1351 mbsl, pumps off |
11 | 20:50:55 | Start lowering probe |
12 | 20:57:30 | CDS lands in BHA; pumps off |
13 | 20:57:49 | Start penetration of T2P into sediment |
14 | 21:00:31 | End of T2P penetration; bit on bottom of hole |
15 | 21:00:37 | Raising BHA 4.0 m off bottom of hole |
16 | 22:07:42 | Pulling T2P uphole slowly with wireline |
17 | 22:10:32 | Stop at 1321 mbsl, pumps off |
18 | 22:13:27 | Pulling T2P uphole slowly with wireline |
19 | 22:19:47 | Stop at 741 mbsl, pumps off |
20 | 22:21:57 | Pulling T2P uphole slowly with wireline |
21 | 22:26:12 | Stop at 491 mbsl, pumps off |
22 | 22:28:28 | Pulling T2P uphole slowly with wireline |
23 | 22:32:54 | Wireline disconnected from CDS |
24 | 22:35:38 | CDS disconnected from spacer |
25 | 22:37:15 | Spacer disconnected from CDS |
26 | 22:38:00 | T2P out of pipe |
27 | Data downloaded from data logger |
Notes: Depth = 42.0 mbsf. Date = 28 June 2005. T2P = temperature/dual pressure probe. CDS = colleted delivery system. BHA = bottom-hole assembly.