Table T17. T2P Deployment 17, Hole U1322B.

Event Time
(GMT)
Description
1 18:39:55 Data logger started at 1 Hz
2 20:10:31 T2P on rig floor
3 20:22:12 Start lowering T2P downhole, pumps on
4 20:29:54 Stop at 491 mbsl, pumps off
5 20:31:58 Start lowering probe
6 20:35:04 Stop at 741 mbsl, pumps off
7 20:37:04 Start lowering probe
8 20:43:20 Stop at 1321 mbsl, pumps off
9 20:46:30 Start lowering probe
10 20:48:58 Stop at 1351 mbsl, pumps off
11 20:50:55 Start lowering probe
12 20:57:30 CDS lands in BHA; pumps off
13 20:57:49 Start penetration of T2P into sediment
14 21:00:31 End of T2P penetration; bit on bottom of hole
15 21:00:37 Raising BHA 4.0 m off bottom of hole
16 22:07:42 Pulling T2P uphole slowly with wireline
17 22:10:32 Stop at 1321 mbsl, pumps off
18 22:13:27 Pulling T2P uphole slowly with wireline
19 22:19:47 Stop at 741 mbsl, pumps off
20 22:21:57 Pulling T2P uphole slowly with wireline
21 22:26:12 Stop at 491 mbsl, pumps off
22 22:28:28 Pulling T2P uphole slowly with wireline
23 22:32:54 Wireline disconnected from CDS
24 22:35:38 CDS disconnected from spacer
25 22:37:15 Spacer disconnected from CDS
26 22:38:00 T2P out of pipe
27   Data downloaded from data logger

Notes: Depth = 42.0 mbsf. Date = 28 June 2005. T2P = temperature/​dual pressure probe. CDS = colleted delivery system. BHA = bottom-hole assembly.