Close   |   Next

Table T1. Site U1329 coring summary.

Hole U1329A
Latitude: 48°47.369´N
Longitude: 126°40.713´W
Seafloor (drill pipe measurement from rig floor, mbrf): 970
Distance between rig floor and sea level (m): 10.9
Water depth (drill pipe measurement from sea level. m): 959.1
Total penetration (mbsf): 220.0
Total drilled interval (mbsf): 220.0; LWD/MWD
Hole U1329B
Latitude: 48°47.375´N
Longitude: 126°40.720´W
Seafloor (drill pipe measurement from rig floor, mbrf): 964.0
Distance between rig floor and sea level (m): 11.0
Water depth (drill pipe measurement from sea level, m): 953
Total penetration (mbsf): 9.5
Hole U1329C
Latitude: 48°47.375´N
Longitude: 126°40.720´W
Seafloor (drill pipe measurement from rig floor, mbrf): 957.4
Distance between rig floor and sea level (m): 11.0
Water depth (drill pipe measurement from sea level. m): 946.4
Total penetration (mbsf): 189.5
Total drilled interval (mbsf): 2
Hole U1329D
Latitude: 48°47.361´N
Longitude: 126°40.716´W
Seafloor (drill pipe measurement from rig floor, mbrf): 957.4
Distance between rig floor and sea level (m): 11.0
Water depth (drill pipe measurement from sea level. m): 946.4
Total penetration (mbsf): 210.5
Total length of cored section (m): 9.5
Total drilled interval (m): 201.0
Hole U1329E
Latitude: 48°47.385´N
Longitude: 126°40.716´W
Seafloor (drill pipe measurement from rig floor, mbrf): 956.5
Distance between rig floor and sea level (m): 11.0
Water depth (drill pipe measurement from sea level, m): 945.5
Total penetration (mbsf): 127.1
Total length of cored section (m): 48.1
Total drilled interval (m): 79
Core,
section
Date
(2005)
Local
time
(h)
Top
depth
(mbsf)
Length (m) Recovery
(%)
Comments
Cored Recovered
311-U1329A-
*****Drilled from 0.0 to 220.0 mbsf*****
LWD/MWD
311-U1329B-
1H
27 Sep
2105
0.0 9.5 10.02 105.5 Missed mudline
Core totals:
9.5 10.02 105.5
311-U1329C-
1H
27 Sep
2150
0.0 8.1 8.19 101.1
2H
27 Sep
2235
8.1 9.5 10.30 108.4 APCT-3 housing test
3H
27 Sep
2320
17.6 9.5 10.19 107.3 APCT; fluorescent microspheres
4H
27 Sep
2359
27.1 9.5 10.13 106.6
5H
28 Sep
0056
36.6 9.5 10.13 106.6 APCT
6H
28 Sep
0135
46.1 9.5 10.17 107.1
7P
28 Sep
0255
55.6 1.0 1.00 100.0 Sheared OS pin
*****Drilled from 55.6 to 57.6 mbsf*****
Overdrill of pressure core
8H
28 Sep
0500
57.6 9.5 10.15 106.8
9H
28 Sep
0600
67.1 9.5 10.27 108.1 APCT-3
10H
28 Sep
0645
76.6 9.5 10.12 106.5 Fluorescent microspheres
11H
28 Sep
0740
86.1 9.5 9.97 104.9 APCT
12H
28 Sep
0825
95.6 9.5 9.77 102.8
13H
28 Sep
0920
105.1 9.5 10.05 105.8 APCT-3
14P
28 Sep
1110
114.6 1.0 1.00 100.0 Sheared OS pin
*****Drilled from 114.6 to 116.6 mbsf*****
Overdrill of pressure core
15H
28 Sep
1300
116.6 9.5 9.78 102.9
16H
28 Sep
1400
126.1 9.5 9.98 105.1
17H
28 Sep
1515
135.6 4.6 4.55 98.9
18X
28 Sep
1645
140.2 9.7 7.90 81.4 Fluorescent microspheres
19X
28 Sep
1745
149.9 9.7 8.15 84.0
20X
28 Sep
1845
159.6 9.7 6.53 67.3
21X
28 Sep
2035
169.3 9.6 7.83 81.6
22X
28 Sep
2335
178.9 9.6 9.00 93.8
23P
29 Sep
0210
188.5 1.0 1.00 100.0 PCS cutting shoe left in hole
Core totals:
187.5 186.16 99.3
311-U1329D-
*****Drilled from 0.0 to 201.0 mbsf*****

1X
30 Sep
1015
201.0 9.50 1.03 10.80
Core totals:
9.50 1.03 10.80
311-U1329E-
1H
01 Oct
0300
0.0 5.0 5.05 101.0 Extra wireline run to unlock lockable float valve
2H
01 Oct
0340
5.0 9.5 9.46 99.6
3H
01 Oct
0415
14.5 9.5 10.06 105.9
4H
01 Oct
0505
24.0 9.5 9.31 98.0 APCT
5P
01 Oct
0630
33.5 1.0 0.00 0.0
*****Drilled from 33.5 to 54.5 mbsf*****
Overdrill of pressure core
6H
01 Oct
0835
54.5 9.5 0.05 0.5 APCT; deployed DVTP after core
*****Drilled from 54.5 to 73.5 mbsf*****
Overdrill of pressure core
7P
01 Oct
1220
73.5 1.0 0.86 86.0 Sheared OS pin
*****Drilled from 73.5 to 104.0 mbsf*****
Overdrill of pressure core
8Y
01 Oct
1430
104.0 1.0 1.00 100.0
*****Drilled from 104.0 to 114.5 mbsf*****
Overdrill of pressure core
9E
01 Oct
1625
114.5 1.0 1.00 100.0
*****Drilled from 114.5 to 125.0 mbsf*****
Overdrill of pressure core
10P
01 Oct
1940
125.0 1.0 0.95 95.0 Deployed DVTP after core
*****Drilled from 125.0 to 126.0 mbsf*****
Overdrill of pressure core; deployed DVTP
Core totals:
48.0 37.74 78.6

Note: LWD/MWD = logging while drilling/measurement while drilling, APCT-3 = third-generation advanced piston corer temperature tool, APCT = advanced piston corer temperature tool, OS = overshot, PCS = Pressure Core Sampler, DVTP = Davis-Villinger Temperature Probe.

Close   |   Next  |   Top of page