Previous   |   Close   |   Next

Figure F45. A. Photograph of bullnose (i.e., lower end cap of smart plug) showing termination of pore pressure tubing (center) for monitoring screened splay fault zone. B. Photograph of instrument on rig floor during final preparation using threadlock to secure bolts.

Previous   |   Close   |   Next   |   Top of page