Table T1. Coring summary, Site U1375.
Hole U1375A | |||||||||||
Latitude: 33°41.9020′S | |||||||||||
Longitude: 171°26.9395′W | |||||||||||
Water depth (m): 1258.0 | |||||||||||
Date started (UTC): 1430 h, 24 January 2011 | |||||||||||
Date finished (UTC): 0830 h, 25 January 2011 | |||||||||||
Time on hole (days): 0.8 | |||||||||||
Seafloor depth DRF (m): 1269.0 | |||||||||||
Seafloor depth estimation method: Tag | |||||||||||
Rig floor to sea level (m): 11.0 | |||||||||||
Penetration DSF (m): 11.5 | |||||||||||
Cored interval (m): 11.5 | |||||||||||
Recovered length (m): 1.5 | |||||||||||
Recovery (%): 13 | |||||||||||
Drilled interval (m): NA | |||||||||||
Number of drilled interval: 0 | |||||||||||
Total number of cores: 2 | |||||||||||
Number of APC cores: 0 | |||||||||||
Number of XCB cores: 0 | |||||||||||
Number of RCB cores: 2 | |||||||||||
Number of other cores: 0 | |||||||||||
Hole U1375B | |||||||||||
Latitude: 33°41.7860′S | |||||||||||
Longitude: 171°27.0753′W | |||||||||||
Water depth (m): 1258.0 | |||||||||||
Date started (UTC): 0830 h, 25 January 2011 | |||||||||||
Date finished (UTC): 0045 h, 26 January 2011 | |||||||||||
Time on hole (days): 0.6 | |||||||||||
Seafloor depth DRF (m): 1269.0 | |||||||||||
Seafloor depth estimation method: Tag | |||||||||||
Rig floor to sea level (m): 11.0 | |||||||||||
Penetration DSF (m): 8.5 | |||||||||||
Cored interval (m): 8.5 | |||||||||||
Recovered length (m): 0.57 | |||||||||||
Recovery (%): 7 | |||||||||||
Drilled interval (m): NA | |||||||||||
Number of drilled interval: 0 | |||||||||||
Total number of cores: 1 | |||||||||||
Number of APC cores: 0 | |||||||||||
Number of XCB cores: 0 | |||||||||||
Number of RCB cores: 1 | |||||||||||
Number of other cores: 0 | |||||||||||
Core
|
Date
(2011) |
Time
UTC (h) |
Depth drilled (m DSF)
|
Advanced
(m) |
Recovered
length (m) |
Curated
length (m) |
Depth cored (m CSF)
|
Recovery
(%) |
|||
---|---|---|---|---|---|---|---|---|---|---|---|
Top
|
Bottom
|
Top
|
Bottom
|
||||||||
330-U1375A- | |||||||||||
1R | 25 Jan | 0305 | 0.0 | 8.5 | 8.5 | 0.02 | 0.02 | 0.0 | 0.0 | 0 | |
2R | 25 Jan | 1000 | 8.5 | 11.5 | 3.0 | 1.48 | 1.61 | 8.5 | 10.1 | 49 | |
330-U1375B- | |||||||||||
1R | 25 Jan | 2040 | 0.0 | 8.5 | 8.5 | 0.57 | 0.61 | 0.0 | 0.6 | 7 | |
Site U1375 totals:
|
20.0 | 2.07 | 2.24 |
NA = not applicable. UTC = universal time coordinated. DRF = drilling depth below rig floor, DSF = drilling depth below seafloor, CSF = core depth below seafloor. APC = advanced piston corer (core type H), XCB = extended core barrel (core type X), RCB = rotary core barrel (core type R).
Close | Next | Top of page