Previous   |    Close   |    Next

Figure F3. Operation time vs. penetration depth, Hole U1376A. Major operation milestones are labeled. Dashed line = planned penetration, solid red line = actual penetration. Rot. = rotation, ROP = rate of penetration. RCB = rotary core barrel, triple combo = triple combination, GBM = Göttingen Borehole Magnetometer, FMS = Formation MicroScanner-sonic.

Previous   |    Close   |    Next   |    Top of page