Table T1. Coring summary, Site U1376.
Hole U1376A | ||||||||||
Latitude: 32°13.0429′S | ||||||||||
Longitude: 171°52.8396′W | ||||||||||
Water depth (m): 1503.3 | ||||||||||
Date started (UTC): 1000 h, 26 January 2011 | ||||||||||
Date finished (UTC): 0800 h, 3 February 2011 | ||||||||||
Time on hole (days): 8.0 | ||||||||||
Seafloor depth DRF (m): 1514.3 | ||||||||||
Seafloor depth estimation method: Tag | ||||||||||
Rig floor to sea level (m): 11.0 | ||||||||||
Penetration DSF (m): 182.8 | ||||||||||
Cored interval (m): 182.8 | ||||||||||
Recovered length (m): 136.17 | ||||||||||
Recovery (%): 75 | ||||||||||
Drilled interval (m): NA | ||||||||||
Number of drilled interval: 0 | ||||||||||
Total number of cores: 23 | ||||||||||
Number of APC cores: 0 | ||||||||||
Number of XCB cores: 0 | ||||||||||
Number of RCB cores: 23 | ||||||||||
Number of other cores: 0 | ||||||||||
Core |
Date (2011) |
Time UTC (h) |
Depth drilled (m DSF) |
Advanced (m) |
Recovered length (m) |
Curated length (m) |
Depth cored (m CSF) |
Recovery (%) |
||
---|---|---|---|---|---|---|---|---|---|---|
Top | Bottom | Top | Bottom | |||||||
330-U1376A- | ||||||||||
1R | 27 Jan | 0615 | 0.0 | 9.5 | 9.5 | 8.03 | 9.03 | 0.0 | 9.0 | 85 |
2R | 27 Jan | 1120 | 9.5 | 19.0 | 9.5 | 7.22 | 7.99 | 9.5 | 17.5 | 76 |
3R | 27 Jan | 2140 | 19.0 | 28.6 | 9.6 | 7.14 | 8.05 | 19.0 | 27.0 | 74 |
4R | 28 Jan | 0800 | 28.6 | 38.2 | 9.6 | 4.49 | 5.62 | 28.6 | 34.2 | 47 |
5R | 28 Jan | 1510 | 38.2 | 47.8 | 9.6 | 8.20 | 8.92 | 38.2 | 47.1 | 85 |
6R | 28 Jan | 2140 | 47.8 | 57.4 | 9.6 | 8.42 | 9.7 | 47.8 | 57.5 | 88 |
7R | 29 Jan | 0435 | 57.4 | 67.0 | 9.6 | 8.74 | 9.57 | 57.4 | 67.0 | 91 |
8R | 29 Jan | 1335 | 67.0 | 76.6 | 9.6 | 9.39 | 10.55 | 67.0 | 77.6 | 98 |
9R | 29 Jan | 2140 | 76.6 | 82.6 | 6.0 | 5.39 | 5.99 | 76.6 | 82.6 | 90 |
10R | 30 Jan | 0230 | 82.6 | 86.8 | 4.2 | 3.49 | 3.67 | 82.6 | 86.3 | 83 |
11R | 31 Jan | 0240 | 86.8 | 96.4 | 9.6 | 6.77 | 7.27 | 86.8 | 94.1 | 71 |
12R | 31 Jan | 0900 | 96.4 | 101.2 | 4.8 | 5.28 | 5.72 | 96.4 | 102.1 | 110 |
13R | 31 Jan | 1305 | 101.2 | 106.0 | 4.8 | 4.50 | 4.7 | 101.2 | 105.9 | 94 |
14R | 31 Jan | 1555 | 106.0 | 110.8 | 4.8 | 4.33 | 4.5 | 106.0 | 110.5 | 90 |
15R | 31 Jan | 1805 | 110.8 | 115.6 | 4.8 | 4.32 | 4.7 | 110.8 | 115.5 | 90 |
16R | 31 Jan | 2105 | 115.6 | 125.2 | 9.6 | 8.44 | 8.99 | 115.6 | 124.6 | 88 |
17R | 1 Feb | 0115 | 125.2 | 134.8 | 9.6 | 4.04 | 4.8 | 125.2 | 130.0 | 42 |
18R | 1 Feb | 0500 | 134.8 | 144.4 | 9.6 | 0.85 | 1.08 | 134.8 | 135.9 | 9 |
19R | 1 Feb | 0930 | 144.4 | 148.1 | 3.7 | 2.84 | 3.52 | 144.4 | 147.9 | 77 |
20R | 1 Feb | 1310 | 148.1 | 154.0 | 5.9 | 5.61 | 6.46 | 148.1 | 154.6 | 95 |
21R | 1 Feb | 1710 | 154.0 | 163.6 | 9.6 | 5.46 | 6.27 | 154.0 | 160.3 | 57 |
22R | 1 Feb | 2100 | 163.6 | 173.2 | 9.6 | 7.38 | 8.2 | 163.6 | 171.8 | 77 |
23R | 2 Feb | 0330 | 173.2 | 182.8 | 9.6 | 5.84 | 7.12 | 173.2 | 180.3 | 61 |
Hole U1376A totals: | 182.8 | 136.17 | 152.42 |
NA = not applicable. UTC = universal time coordinated. DRF = drilling depth below rig floor, DSF = drilling depth below seafloor, CSF = core depth below seafloor. APC = advanced piston corer (core type H), XCB = extended core barrel (core type X), RCB = rotary core barrel (core type R).
Close | Next | Top of page