Table T1. Coring summary, Site C0016.
Site C0016 | |||||||||
Time on site (h): 79 | |||||||||
Hole C0016A | |||||||||
Latitude: 27°47.4548’N | |||||||||
Longitude: 126°53.8034’E | |||||||||
Time on hole (h): 11.5 (0001 h, September 26–1130 h, September 26) | |||||||||
Seafloor depth (m DRF): 1010.5 | |||||||||
Distance between rig floor and sea level (m): 28.5 | |||||||||
Water depth (mbsl): 982 | |||||||||
Total depth (m DRF): 1028.5 | |||||||||
Total penetration (mbsf): 18 | |||||||||
Total length of cored section (m): 18 | |||||||||
Total core recovered (m): 0 | |||||||||
Core recovery: 0 | |||||||||
Total number of cores: 0 | |||||||||
Hole C0016B | |||||||||
Latitude: 27°47.4538’N | |||||||||
Longitude: 126°53.7860’E | |||||||||
Time on hole (h): 67 (2055 h, September 30–1535 h, October 3) | |||||||||
Seafloor depth (m DRF): 1023.5 | |||||||||
Distance between rig floor and sea level (m): 28.5 | |||||||||
Water depth (mbsl): 995 | |||||||||
Total depth (m DRF): 1072.2 | |||||||||
Total penetration (mbsf): 44.9 | |||||||||
Total length of cored section (m): 44.9 | |||||||||
Total core recovered (m): 1.74 | |||||||||
Core recovery: 3.9 | |||||||||
Total number of cores: 3 | |||||||||
Core | Date (2010) | Local time (h) | Depth DRF (m) | Depth (mbsf) | Advanced (m) | Recovered (m) | Recovery (%) | ||
---|---|---|---|---|---|---|---|---|---|
Top | Bottom | Top | Bottom | ||||||
331-C0016A- | |||||||||
1L | 26 Sep | 0430 | 1010.5 | 1028.5 | 0 | 18 | 18 | 0 | 0 |
331-C0016B- | |||||||||
1L | 30 Sep | 2055 | 1027.3 | 1036.3 | 0 | 9 | 9 | 0.71 | 7.9 |
2L | 1 Oct | 2035 | 1036.3 | 1054.3 | 9 | 27 | 18 | 0.31 | 1.7 |
3L | 2 Oct | 1525 | 1054.3 | 1072.2 | 27 | 44.9 | 17.9 | 0.72 | 4 |
DRF = drilling depth below rig floor. L = BHI.