Close   |    Next

Table T1. Coring summary, Site C0017.

Site C0017
Time on site (h): 84
Hole C0017A
Latitude: 27°47.5030’N
Longitude: 126°54.7176’E
Time on hole (h): 0.5 (1132 h, September 27–1150 h, September 27)
Seafloor depth (m DRF): 1158.1
Distance between rig floor and sea level (m): 28.5
Water depth (mbsl): 1129.6
Total depth (mDRF): 1166.9
Total penetration (mbsf): 8.8
Total length of cored section (m): 8.8
Total core recovered (m): 8.8
Core recovery: 100
Total number of cores: 1
Hole C0017B
Latitude: 27°47.5027’N
Longitude: 126°54.7176’E
Time on hole (h): 1 (1251 h, September 27–1325 h, September 27)
Seafloor depth (m DRF): 1158.1
Distance between rig floor and sea level (m): 28.5
Water depth (mbsl): 1129.6
Total depth (m DRF): 1176.4
Total penetration (mbsf): 18.3
Total length of cored section (m): 9.5
Total core recovered (m): 9.5
Core recovery: 100
Total number of cores: 1
Hole C0017C
Latitude: 27°47.5039’N
Longitude: 126°54.7202’E
Time on hole (h): 6.25 (1412 h, September 27–2040 h, September 27)
Seafloor depth (m DRF): 1158.1
Distance between rig floor and sea level (m): 28.5
Water depth (mbsl): 1129.6
Total depth (m DRF): 1208.1
Total penetration (mbsf): 50
Total length of cored section (m): 19
Total core recovered (m): 18
Core recovery: 94.7
Total number of cores: 2
Hole C0017D
Latitude: 27°47.5049’N
Longitude: 126°54.7217’E
Time on hole (h): 16.5 (0240 h, September 28–1708 h, September 28)
Seafloor depth (m DRF): 1158
Distance between rig floor and sea level (m): 28.5
Water depth (mbsl): 1129.5
Total depth (m DRF): 1307.7
Total penetration (mbsf): 150.7
Total length of cored section (m): 90.7
Total core recovered (m): 49.6
Core recovery: 54.7
Total number of cores: 12
Core
Date (2010)
Local time (h)
Depth DRF (m)  
Depth (mbsf)
Advanced (m)
Recovered (m)
Recovery (%)
Top
Bottom  
Top
Bottom
331-C0017A-
1H 27 Sep 1132 1158.1 1166.9   0 8.8 8.8 8.8 100
331-C0017B-
1H 27 Sep 1303 1166.9 1176.4   8.8 18.3 9.5 9.5 100
331-C0017C-
1H 27 Sep 1450 1176.4 1185.9   18.3 27.8 9.5 9.5 100
2H 27 Sep 1801 1185.9 1195.4   27.8 37.3 9.5 8.5 89.5
331-C0017D-
1H 28 Sep 0628 1218 1227.2   60 69.2 9.2 9.2 100
2H 28 Sep 0915 1227.2 1236.7   69.2 78.7 9.5 9 94.7
3H 28 Sep 1205 1236.7 1242.7   78.7 84.7 6 0 0
4H 28 Sep 1423 1242.7 1242.7   84.7 84.7 0 0 0
5T 28 Sep 1720 1242.7 1252.7   84.7 94.2 9.5 0 0
6X 28 Sep 2039 1252.2 1261.7   94.2 103.7 9.5 1.8 18.9
7H 29 Sep 0042 1261.7 1270.2   103.7 112.2 8.5 8.5 100
8T 29 Sep 0248 1270.2 1279.7   112.2 121.7 9.5 0.09 0.9
9X 29 Sep 0457 1279.7 1288.7   121.7 130.7 9 9.7 107.8
10X 29 Sep 0740 1288.7 1298.2   103.7 140.2 9.5 6.5 68.4
11X 29 Sep 0944 1298.2 1307.7   140.2 149.7 9.5 4.8 50.5
12H 30 Sep 0029 1307.7 1308.7   149.7 150.7 1 0 0

DRF = drilling depth below rig floor. H = HPCS, T = EPCS, X = ESCS.

Close   |    Next   |    Top of page