Previous   |    Close   |    Next

Figure F20. Timeline showing the acceleration forces encountered during lowering drill pipe, drifting to the site, reentry to the wellhead, remotely operated vehicle (ROV) testing the LTBMS sensors, cementing and pulling out of the hole (POOH), and retrieval of the drill pipe at Site C0002. Yellow shading = data during drifting.

Previous   |    Close   |    Next   |    Top of page