Previous   |    Close   |    Next

Figure F3. Photograph of Hole 395A L-CORK configuration before deployment, showing extension required to fit the old Deep Sea Drilling Project (DSDP)-style reentry cone and stabilizer fins that should have passed through the 24 inch transition casing.

Previous   |    Close   |    Next   |    Top of page