Previous   |    Close   |    Next

Table T3. Downhole instrument string deployed in Hole 395A.

Item Length
(m)
Connector
length
(m)*
Bottom
depth
(mbsf)
FLOCS or
O2 probe ID
Temperature
probe
Bottom of plug**     –5.84    
Spectra** 58.25 (59.12)        
Sinker bar - 100 lb 1.52   54.8    
Spectra 58.66 (59.54)        
Landing seat, 3.375 111.5 0.16 111.66    
MBIO 5.73 0.16 117.55 88/89 A 1857001
Enrichment 5.2 0.16 122.91 78/79  
Standard 2.63 0.16 125.7    
Acid addition 5.2 0.16 131.06    
BOSS 5.2 0.16 136.42    
Oxygen probe 0.58 0.16 137.16 49  
Copper - Gas 2.63 0.16 139.95   O 9913815
Spectra 10.02 (10.17)        
Landing seat, 3.125 148.8 0.16 148.96    
Spectra rope 83.00 (84.25) 0.16 233.37    
MBIO 5.73 0.16 239.26 80/81  
Enrichment 5.2 0.16 244.62 86/87  
Standard 2.63 0.16 247.41    
Acid addition 5.2 0.16 252.77    
BOSS 5.2 0.16 258.13    
Copper - Gas 2.63 0.16 260.92   O 9413814
Spectra rope 146.00 (148.19) 0.16 409.27    
MBIO 5.73 0.16 415.16 84/85 A 1857002
Enrichment 5.2 0.16 420.52 74/75  
Standard 2.63 0.16 423.31    
Acid addition 5.2 0.16 428.67    
BOSS 5.2 0.16 434.03    
Oxygen probe 0.58 0.16 434.77 77  
Copper - Gas 2.63 0.16 437.56   O 9913816
Spectra rope 31.25 (31.72)        
Landing seat, 2.875 463.5 0.16 463.66    
Spectra rope 27.00 (27.41) 0.16 491.23    
MBIO 7.61 0.16 499 76/77 A 1857003
Enrichment 6.8 0.16 505.96 82/83  
Standard 3.43 0.16 509.55    
Acid addition 6.8 0.16 516.51    
BOSS 6.8 0.16 523.47    
Copper - Gas 3.43 0.16 527.06   O 9913813
Sinker bar - 150 lb 3.19 0.16 530.41    

* = a stainless steel coupler was used to join two packages and join packages to landing seats. † = temperature probes were purchased from Onset (O) and Antares (A); probes are located 53 cm from the top of the 2.875 inch diameter OsmoSampler packages and 60 cm from the top of 2.5 inch diameter packages. ‡ = Spectra lengths are given in measured units and expected lengths based on stretch within the hole (in parentheses); some downhole depths for Spectra are not given because additional line was used to ensure that the plugs could seat at the correct depths. ** = these depths refer to predeployment configuration; depths and lengths are not accurate considering that the CORK wellhead severed during deployment. Lifting loops were weaved every 12.5 m from the top plug. FLOCS = Flow-through Osmo Colonization System. MBIO = microbiology, BOSS = BioOsmoSampling System.

Previous   |    Close   |    Next   |    Top of page