Table T8. Logging operations summary, Hole 395A.

Date
(2011)
Time
(h)
Activity
24 Sep 0335 Downhole logging operations start
24 Sep 0532 Winch spooling mechanism fails
24 Sep 0628 Winch fixed; continue running tool into Hole 395A
24 Sep 0952 Logging aborted because of impassable ledge at 4670 m wireline log depth below rig floor (WRF)
24 Sep 1410 Microbiology combo back to the surface and rigged down
24 Sep 1610 Tool string run back into hole following the logging bit run down past the obstruction; pipe set at 4691.76 mbrf
24 Sep 1635 Begin downlog at 4448 m WRF (275 m/h)
24 Sep 2046 Reach total depth 5094 m WRF
24 Sep 2046 Start first uplog (275 m/h)
24 Sep 2216 Start second downlog at 4687.1 m WRF (366 m/h)
24 Sep 2322 Start second uplog at 5094.1 m WRF (549 m/h); uplog ended just beyond where the tool crossed the seafloor at 4496 m WRF
25 Sep 0330 Logging tool string rigged down and operations complete

Time is reported as ship local (UTC – 3 h).