Previous   |    Close   |    Next

Table T21. Core top and composite depth, Site U1407.

Core Depth Offset (m) Cumulative
offset (m)
Comment
(mbsf) (m CCSF)
342-U1407A-
1H 0.00 0.00 0.00 0.00  
2H 6.80 7.35 0.55 0.55  
3H 16.30 18.85 2.00 2.55  
4H 25.80 28.35 0.00 2.55 Tentative
5H 35.30 38.62 0.77 3.32 Tentative
6H 44.80 53.19 5.07 8.39  
7H 54.30 63.04 0.35 8.74  
8H 63.80 73.23 0.69 9.43  
9H 73.30 85.10 2.37 11.80  
10H 82.80 94.99 0.39 12.19  
11H 92.30 106.42 1.93 14.12  
12H 101.80 116.11 0.19 14.31  
13H 102.80 117.11 0.00 14.31  
14H 112.30 126.61 0.00 14.31  
15H 121.80 136.11 0.00 14.31  
16X 121.90 137.40 1.19 15.50  
17X 126.30 141.80 0.00 15.50  
18X 135.90 158.43 7.03 22.53  
19X 145.50 166.98 –1.05 21.48  
20X 155.10 185.60 9.02 30.50  
21X 164.70 195.12 –0.08 30.42  
22X 174.30 204.45 –0.27 30.15  
23X 183.90 212.93 –1.12 29.03  
24X 193.50 227.12 4.59 33.62 Tentative
25X 203.10 238.78 2.06 35.68  
26X 212.70 249.04 0.66 36.34  
27X 222.30 259.89 1.25 37.59 Tentative
28X 231.90 268.85 –0.64 36.95  
29X 241.50 286.73 8.28 45.23 Large offset
30X 251.10 298.61 2.28 47.51  
31X 260.70 307.66 –0.55 46.96  
32X 270.30 317.26 0.00 46.96  
33X 279.90 326.86 0.00 46.96  
34X 289.50 336.46 0.00 46.96  
35X 299.10 346.06 0.00 46.96  
342-U1407B-
1H 0.00 0.10 0.10 0.10  
2H 8.40 8.85 0.35 0.45  
3H 17.90 18.85 0.50 0.95  
4H 27.40 28.35 0.00 0.95 Drilling advance
5H 30.40 29.85 –1.50 –0.55  
6H 39.90 44.13 4.78 4.23 Tentative
7H 49.40 54.97 1.34 5.57  
8H 58.90 65.72 1.25 6.82  
9H 68.40 76.47 1.25 8.07  
10H 77.90 87.30 1.33 9.40  
11H 87.40 99.99 3.19 12.59  
12H 95.00 107.59 0.00 12.59 Drilling advance
13X 127.00 154.57 14.98 27.57 Large offset
14X 136.60 164.28 0.11 27.68  
15X 146.20 174.08 0.20 27.88  
16X 155.80 183.74 0.06 27.94  
17X 165.40 195.30 1.96 29.90  
18X 175.00 205.32 0.42 30.32  
19X 184.60 212.50 –2.42 27.90  
20X 192.60 224.04 3.54 31.44  
21X 200.60 233.22 1.18 32.62  
22X 209.10 244.37 2.65 35.27  
23X 218.70 253.81 –0.16 35.11  
24X 228.30 265.24 1.83 36.94  
25X 237.90 278.38 3.54 40.48  
26X 247.50 289.74 1.76 42.24  
27X 257.10 304.53 5.19 47.43  
28X 266.70 313.46 –0.67 46.76  
342-U1407C-
1H 0.00 0.10 0.10 0.10  
2H 7.70 7.80 0.00 0.10 Drilling advance
3H 10.70 10.79 –0.01 0.09  
4H 20.20 18.55 –1.74 –1.65 Tentative
5H 29.70 31.35 3.30 1.65 Tentative
6H 39.20 45.08 4.23 5.88 Tentative
7H 48.70 66.97 12.39 18.27 Large offset
8H 58.20 77.78 1.31 19.58  
9H 67.70 86.83 –0.45 19.13  
10H 77.20 96.58 0.25 19.38  
11H 86.70 106.40 0.32 19.70  
12H 96.00 115.70 0.00 19.70 Drilling advance
13X 117.00 136.70 0.00 19.70  
14X 122.00 145.77 4.07 23.77 Offset to remove overlap
15X 131.60 155.58 0.21 23.98  
16X 141.20 165.98 0.80 24.78  
17X 150.80 176.74 1.16 25.94  
18X 160.40 186.43 0.09 26.03  
19X 170.00 198.37 2.34 28.37  
20X 175.00 208.38 5.01 33.38  
21X 184.60 219.92 1.94 35.32 Tentative
22X 193.10 228.90 0.48 35.80  
23X 202.70 240.41 1.91 37.71  
24X 209.20 248.34 1.43 39.14  
25X 216.20 254.86 –0.48 38.66  
26X 223.20 262.35 0.49 39.15  
27X 232.80 271.07 –0.88 38.27  
28X 242.40 291.10 10.43 48.70 Large offset
29X 252.00 300.45 –0.25 48.45  

Previous   |    Close   |    Next   |    Top of page