Previous   |    Close   |    Next

Table T4. Summary of alteration features observed in basement, Hole U1414A.

  Total Saponite Carbonate Pyrite Smectite Quartz Zeolite
Veins per meter: 19.99 7.95 3.05 4.04 10.87 1.82 0.12
Abundance of vein-filling minerals (vol%): 3.47 1.65 0.39 0.13 0.91 0.46 0.002
Abundance of secondary minerals in breccia (vol%): 0.28     0.004 0.28    
Abundance of vesicle-filling secondary minerals (vol%): 2.32 0.71 0.001 0.05 1.512 0.044 0.0004
Abundance of secondary minerals occupying veins and breccia (vol%): 3.75 1.65 0.39 0.13 1.19 0.46 0.002
Total secondary mineral abundance (veins, breccia, and vesicles) (vol%): 6.07 2.35 0.39 0.18 2.7 0.5 0.003

Veins per meter was normalized to 100% recovery. Volume percent was calculated based on the surface area that each alteration feature occupied on the cut surface of recovered core. Raw data sourced from visual observations (web.iodp.tamu.edu/​UWQ/).

Previous   |    Close   |    Next   |    Top of page