Close   |    Next

Table T1. Site U1413 coring summary.

Hole U1413A
Latitude: 8°44.4593′N
Longitude: 84°6.8095′W
Time on hole (h): 48.5 (2.02 days)
Seafloor (drill pipe measurement from rig floor, m DRF): 550.9
Distance between rig floor and sea level (m): 11.0
Water depth (drill pipe measurement from sea level, m): 539.9
Total penetration (drilling depth below seafloor, m DSF): 189.1
Total length of cored section (m): 189.1
Total core recovered (m): 187.3
Core recovery (%): 99
Total number of cores: 26
Hole U1413B
Latitude: 8°44.4593′N
Longitude: 84°6.7992′W
Time on hole (h): 6.0 (0.25 days)
Seafloor (drill pipe measurement from rig floor, m DRF): 551.4
Distance between rig floor and sea level (m): 11.3
Water depth (drill pipe measurement from sea level, m): 540.4
Total penetration (drilling depth below seafloor, m DSF): 25.6
Total length of cored section (m): 25.6
Total core recovered (m): 27.4
Core recovery (%): 107
Total number of cores: 3
Hole U1413C
Latitude: 8°44.4482′N
Longitude: 84°6.7993′W
Time on hole (h): 115.93 (4.83 days)
Seafloor (drill pipe measurement from rig floor, m DRF): 551.4
Distance between rig floor and sea level (m): 11.3
Water depth (drill pipe measurement from sea level, m): 540.4
Total penetration (drilling depth below seafloor, m DSF): 582.2
Total length of cored section (m): 404.2
Total core recovered (m): 313.9
Core recovery (%): 78
Total number of cores: 42
Core Date
(2012)
Time
UTC
(h)
Depth DSF (m) Interval
advanced
(m)
Depth CSF (m) Length
of core
recovered
(m)
Recovery
(%)
Comments
Top of cored interval Bottom of cored interval Top of cored interval Bottom of cored interval
344-U1413A-
1H Nov 24 1245 0.00 6.60 6.6 0.00 6.65 6.65 101 FlexIt
2H Nov 24 1340 6.60 16.10 9.5 6.60 16.64 10.04 106 FlexIt
3H Nov 24 1435 16.10 25.60 9.5 16.10 25.94 9.84 104 FlexIt, APCT-3
4H Nov 24 1520 25.60 35.10 9.5 25.60 34.57 9.05 95 FlexIt
5H Nov 24 1615 35.10 44.60 9.5 35.10 45.46 10.36 109 FlexIt, APCT-3
6H Nov 24 1715 44.60 52.00 7.4 44.60 52.06 7.46 101 FlexIt, APCT-3
7H Nov 24 2220 52.00 60.90 8.9 52.00 60.95 8.95 101 FlexIt, APCT-3
8H Nov 25 0400 60.90 70.00 9.1 60.90 70.00 9.10 100 FlexIt, APCT-3
9H Nov 25 0500 70.00 79.50 9.5 70.00 79.71 9.71 102 FlexIt
10H Nov 25 0605 79.50 89.00 9.5 79.50 89.88 10.38 109 FlexIt
11H Nov 25 0705 89.00 97.90 8.9 89.00 97.97 8.97 101 FlexIt
12H Nov 25 0750 97.90 105.60 7.7 97.90 105.67 7.77 101 FlexIt
13H Nov 25 0845 105.60 113.40 7.8 105.60 113.49 7.89 101 FlexIt
14H Nov 25 0935 113.40 118.70 5.3 113.40 118.77 5.37 101 FlexIt
15H Nov 25 1030 118.70 124.40 5.7 118.70 124.44 5.74 101 FlexIt
16H Nov 25 1110 124.40 129.70 5.3 124.40 129.78 5.38 102 FlexIt
17H Nov 25 1200 129.70 135.70 6.0 129.70 135.72 6.02 100 FlexIt
18H Nov 25 1250 135.70 140.60 4.9 135.70 140.60 4.90 100 FlexIt
19X Nov 25 1510 140.60 150.30 9.7 140.60 149.36 8.76 90  
20X Nov 25 1640 150.30 160.00 9.7 150.30 160.16 9.86 102  
21X Nov 25 1840 160.00 169.70 9.7 160.00 169.92 9.92 102  
22X Nov 25 2030 169.70 174.30 4.6 169.70 172.37 2.67 58  
23X Nov 25 2200 174.30 175.30 1.0 174.30 174.92 0.62 62  
24X Nov 26 0010 175.30 179.40 4.1 175.30 180.06 4.76 116  
25X Nov 26 0205 179.40 182.00 2.6 179.40 181.60 2.20 85  
26X Nov 26 0405 182.00 189.10 7.1 182.00 186.91 4.91 69  
Hole U1413A totals: 189.1     187.28 99  
344-U1413B-
1H Nov 26 0705 0.00 6.60 6.6 0.00 6.65 6.65 101  
2H Nov 26 0730 6.60 16.10 9.5 6.60 16.54 9.94 105  
3H Nov 26 0800 16.10 25.60 9.5 16.10 26.95 10.85 114  
Hole U1413B totals: 25.6     27.44 107  
344-U1413C-
11 *****Drilled from 0.0 to 178.0 m DSF*****
2R Nov 27 0520 178.00 187.70 9.7 178.00 185.10 7.10 73  
3R Nov 27 0650 187.70 197.40 9.7 187.70 190.86 3.16 33  
4R Nov 27 0840 197.40 207.10 9.7 197.40 197.50 0.10 1  
5R Nov 27 1025 207.10 216.80 9.7 207.10 211.76 4.66 48  
6R Nov 27 1130 216.80 226.50 9.7 216.80 224.09 7.29 75  
7R Nov 27 1250 226.50 236.20 9.7 226.50 236.38 9.88 102  
8R Nov 27 1415 236.20 245.90 9.7 236.20 246.06 9.86 102  
9R Nov 27 1540 245.90 255.60 9.7 245.90 255.76 0.00 0  
10R Nov 27 1640 255.60 265.30 9.7 255.60 264.39 8.79 91  
11R Nov 27 1745 265.30 275.00 9.7 265.30 270.90 5.60 58  
12R Nov 27 1905 275.00 284.70 9.7 275.00 285.04 10.04 104  
13R Nov 27 2020 284.70 294.40 9.7 284.70 291.71 7.01 72  
14R Nov 27 2205 294.40 304.10 9.7 294.40 299.97 5.57 57  
15R Nov 27 2340 304.10 313.80 9.7 304.10 309.20 5.10 53  
16R Nov 28 0125 313.80 323.50 9.7 313.80 323.59 9.79 101  
17R Nov 28 0245 323.50 333.20 9.7 323.50 333.43 9.93 102  
18R Nov 28 0355 333.20 342.90 9.7 333.20 334.28 1.08 11  
19R Nov 28 0530 342.90 352.60 9.7 342.90 350.77 7.87 81  
20R Nov 28 0725 352.60 362.30 9.7 352.60 357.91 5.31 55  
21R Nov 28 0905 362.30 372.00 9.7 362.30 371.39 9.09 94  
22R Nov 28 1020 372.00 381.70 9.7 372.00 381.98 9.98 103  
23R Nov 28 1150 381.70 391.40 9.7 381.70 391.76 10.06 104  
24R Nov 28 1315 391.40 401.10 9.7 391.40 401.51 10.11 104  
25R Nov 28 1455 401.10 410.80 9.7 401.10 409.88 8.78 91  
26R Nov 28 1610 410.80 420.50 9.7 410.80 419.19 8.39 86  
27R Nov 28 1730 420.50 430.20 9.7 420.50 429.36 8.86 91  
28R Nov 28 1845 430.20 439.90 9.7 430.20 437.03 6.83 70  
29R Nov 28 2020 439.90 449.60 9.7 439.90 445.95 6.05 62  
30R Nov 28 2230 449.60 459.30 9.7 449.60 459.47 9.87 102  
31R Nov 29 0015 459.30 469.00 9.7 459.30 469.24 9.94 102  
32R Nov 29 0150 469.00 478.70 9.7 469.00 478.78 9.78 101  
33R Nov 29 0310 478.70 488.40 9.7 478.70 488.61 9.91 102  
34R Nov 29 0440 488.40 498.10 9.7 488.40 497.32 8.92 92  
35R Nov 29 0555 498.10 507.80 9.7 498.10 504.18 6.08 63  
36R Nov 29 0735 507.80 517.50 9.7 507.80 516.95 9.15 94  
37R Nov 29 0900 517.50 527.20 9.7 517.50 526.22 8.72 90  
38R Nov 29 1035 527.20 536.90 9.7 527.20 533.99 6.79 70  
39R Nov 29 1210 536.90 546.60 9.7 536.90 546.73 9.83 101  
40R Nov 29 1350 546.60 556.30 9.7 546.60 556.55 9.95 103  
41R Nov 29 1535 556.30 566.00 9.7 556.30 564.74 8.44 87  
42R Nov 29 1725 566.00 575.70 9.7 566.00 573.13 7.13 74  
43R Nov 29 1945 575.70 582.20 6.5 575.70 578.84 3.14 48  
Hole U1413C totals: 582.2     313.94 78  
Site U1413 totals: 796.90     528.60    

DSF = drilling depth below seafloor, CSF = core depth below seafloor. H = advanced piston corer core, X = extended core barrel core, R = rotary core barrel core, numeric core type = drilled interval. APCT-3 = advanced piston corer temperature tool.

Close   |    Next   |    Top of page