Table T1. Operations summary, Holes U1415F and U1415G.
Hole U1415F (jet-in test only; no coring): | ||||||||
Latitude: 2°15.1394′N | ||||||||
Longitude: 101°32.6261′W | ||||||||
Time at site (h): 19.0 (0215 h, 26 December–2115 h, 26 December 2012) | ||||||||
Seafloor (drill pipe measurement below rig floor, m DRF): 4857.0 | ||||||||
Distance between rig floor and sea level (m): 11.2 | ||||||||
Water depth (drill pipe measurement from sea level, mbsl): 4845.8 | ||||||||
Total penetration (drilling depth below seafloor, m DSF): 1.5 | ||||||||
Hole U1415G (RCB coring): | ||||||||
Latitude: 2°15.1390′N | ||||||||
Longitude: 101°32.6263′W | ||||||||
Time on site (h): 7.5 (2115 h, 26 December–0445 h, 27 December 2012) | ||||||||
Seafloor (drill pipe measurement below rig floor, m DRF): 4857.0 | ||||||||
Distance between rig floor and sea level (m): 11.2 | ||||||||
Water depth (drill pipe measurement from sea level, mbsl): 4845.8 | ||||||||
Total penetration (drilling depth below seafloor, m DSF): 12.9 | ||||||||
Total depth (drill pipe measurement from rig floor, m DRF): 4869.9 | ||||||||
Total length of cored section (m): 12.9 | ||||||||
Total core recovered (m): 0.29 | ||||||||
Core recovery (%): 2 | ||||||||
Drilled interval (m): 0 | ||||||||
Total number of cores: 1 RCB | ||||||||
Core | Depth (mbsf) |
Interval cored (m) |
Core recovered (m) |
Curated length (m) |
Recovery (%) |
Date (2012) |
Time UTC (h) |
|
---|---|---|---|---|---|---|---|---|
Top of cored interval |
Bottom of cored interval |
|||||||
345-U1415G- | ||||||||
1R | 0.0 | 12.9 | 12.9 | 0.29 | 0.26 | 2 | 27 Dec | 0710 |
Total: | 12.9 | 0.29 | 0.26 | 2 |
Local ship time was UTC – 7 h. DRF = drilling depth below rig floor, DSF = drilling depth below seafloor. R = rotary core barrel (RCB) system.
Close | Next | Top of page