Table T1. Coring summary, Site U1422.

Hole U1422A
Latitude: 43°45.9903′N
Longitude: 138°49.9894′E
Water depth (m): NA (missed mudline)
Date started (UTC): 0548 h 17 August 2013
Date finished (UTC): 1845 h 17 August 2013
Time on hole (days): 0.54
Seafloor depth (drill pipe measurement below rig floor, m DRF): Spud core recovered full—no mudline established
Distance between rig floor and sea level (m): NA
Penetration DSF (m): 9.5
Cored interval (m): 9.5
Recovered length (m): 9.96
Recovery (%): 105
Drilled interval (m): NA
Drilled interval: 0
Total cores: 1
APC cores: 1
XCB cores: 0
RCB cores: 0
Other cores: 0
Hole U1422B
Latitude: 43°45.9981′N
Longitude: 138°49.9910′E
Water depth (m): NA (missed mudline)
Date started (UTC): 1845 h 17 August 2013
Date finished (UTC): 2020 h 17 August 2013
Time on hole (days): 0.07
Seafloor depth (drill pipe measurement below rig floor, m DRF): Spud core recovered full—no mudline established
Distance between rig floor and sea level (m): NA
Penetration DSF (m): 9.5
Cored interval (m): 9.5
Recovered length (m): 9.67
Recovery (%): 102
Drilled interval (m): NA
Drilled interval: 0
Total cores: 1
APC cores: 1
XCB cores: 0
RCB cores: 0
Other cores: 0
Hole U1422C
Latitude: 43°45.9816′N
Longitude: 138°49.9897′E
Water depth (m): 3428.91
Date started (UTC): 2020 h 17 August 2013
Date finished (UTC): 1050 h 19 August 2013
Time on hole (days): 1.60
Seafloor depth (drill pipe measurement below rig floor, m DRF): 3440.3
Distance between rig floor and sea level (m): 11.39
Penetration DSF (m): 205.2
Cored interval (m): 205.2
Recovered length (m): 215.78
Recovery (%): 105
Drilled interval (m): NA
Drilled interval: 0
Total cores: 31
APC cores: 31
XCB cores: 0
RCB cores: 0
Other cores: 0
Hole U1422D
Latitude: 43°45.9899′N
Longitude: 138°49.9785′E
Water depth (m): 3428.46
Date started (UTC): 1050 h 19 August 2013
Date finished (UTC): 0335 h 20 August 2013
Time on hole (days): 0.70
Seafloor depth (drill pipe measurement below rig floor, m DRF): 3439.8
Distance between rig floor and sea level (m): 11.34
Penetration DSF (m): 141.8
Cored interval (m): 141.8
Recovered length (m): 152.83
Recovery (%): 108
Drilled interval (m): NA
Drilled interval: 0
Total cores: 16
APC cores: 16
XCB cores: 0
RCB cores: 0
Other cores: 0
Hole: U1422E
Latitude: 43°45.9896′N
Longitude: 138°50.0003′E
Water depth (m): 3428.66
Date started (UTC): 0335 h 20 August 2013
Date finished (UTC): 0000 h 21 August 2013
Time on hole (days): 0.85
Seafloor depth (drill pipe measurement below rig floor, m DRF): 3440
Distance between rig floor and sea level (m): 11.34
Penetration DSF (m): 111.6
Cored interval (m): 111.6
Recovered length (m): 114.34
Recovery (%): 102
Drilled interval (m): NA
Drilled interval: 0
Total cores: 14
APC cores: 14
XCB cores: 0
RCB cores: 0
Other cores: 0
Site U1422 totals
Number of cores: 63
Penetration (m): 477.6
Cored (m): 477.6
Recovered (m): 502.58 (105.2%)
Core Date
(Aug 2013)
Time
(h)
Top depth
of cored
interval
DSF (m)
Bottom depth
of cored
interval
DSF (m)
Interval
advanced
(m)
Top depth
of recovered
core
CSF (m)
Bottom depth
of recovered
core
CSF (m)
Length
of core
recovered
(m)
Curated
length
(m)
Recovery
(%)
346-U1422A-
1H 17 1905 0.0 9.5 9.5 0.0 9.96 9.96 9.96 105
346-U1422B-
1H 17 2045 0.0 9.5 9.5 0.0 9.67 9.67 9.67 102
346-U1422C-
1H 17 2155 0.0 4.6 4.6 0.0 4.64 4.64 4.64 101
2H 17 2325 4.6 14.1 9.5 4.6 14.31 9.71 9.71 102
3H 18 0025 14.1 23.6 9.5 14.1 24.04 9.94 9.94 105
4H 18 0145 23.6 33.1 9.5 23.6 33.45 9.85 9.85 104
5H 18 0255 33.1 42.6 9.5 33.1 42.51 9.41 9.41 99
6H 18 0400 42.6 52.1 9.5 42.6 52.29 9.69 9.69 102
7H 18 0530 52.1 61.6 9.5 52.1 62.17 10.07 10.07 106
8H 18 0640 61.6 71.1 9.5 61.6 71.43 9.83 9.83 103
9H 18 0745 71.1 77.8 6.7 71.1 77.83 6.73 6.73 100
10H 18 0935 77.8 87.3 9.5 77.8 87.83 10.03 10.03 106
11H 18 1100 87.3 96.8 9.5 87.3 97.05 9.75 9.75 103
12H 18 1235 96.8 106.3 9.5 96.8 106.85 10.05 10.05 106
13H 18 1430 106.3 115.8 9.5 106.3 116.23 9.93 9.93 105
14H 18 1550 115.8 125.3 9.5 115.8 125.75 9.95 9.95 105
15H 18 1725 125.3 130.0 4.7 125.3 130.35 5.05 5.05 107
16H 18 1835 130.0 134.7 4.7 130.0 135.12 5.12 5.12 109
17H 18 1950 134.7 139.4 4.7 134.7 139.82 5.12 5.12 109
18H 18 2105 139.4 144.1 4.7 139.4 144.46 5.06 5.06 108
19H 18 2200 144.1 148.8 4.7 144.1 149.24 5.14 5.14 109
20H 18 2255 148.8 153.5 4.7 148.8 153.87 5.07 5.07 108
21H 19 0005 153.5 158.2 4.7 153.5 158.65 5.15 5.15 110
22H 19 0145 158.2 162.9 4.7 158.2 163.21 5.01 5.01 107
23H 19 0245 162.9 167.6 4.7 162.9 167.89 4.99 4.99 106
24H 19 0340 167.6 172.3 4.7 167.6 172.64 5.04 5.04 107
25H 19 0430 172.3 177.0 4.7 172.3 177.39 5.09 5.09 108
26H 19 0520 177.0 181.7 4.7 177.0 182.03 5.03 5.03 107
27H 19 0610 181.7 186.4 4.7 181.7 186.7 5.00 5.00 106
28H 19 0700 186.4 191.1 4.7 186.4 191.57 5.17 5.17 110
29H 19 0750 191.1 195.8 4.7 191.1 196.06 4.96 4.96 106
30H 19 0845 195.8 200.5 4.7 195.8 200.95 5.15 5.15 110
31H 19 0940 200.5 205.2 4.7 200.5 205.55 5.05 5.05 107
Total advanced: 205.2 Total recovered: 215.78    
346-U1422D-
1H 19 1250 0.0 8.1 8.1 0.0 8.14 8.14 8.14 100
2H 19 1330 8.1 12.1 4.0 8.1 17.87 9.77 9.77 244
3H 19 1445 12.1 21.6 9.5 12.1 22.09 9.99 9.99 105
4H 19 1540 21.6 31.1 9.5 21.6 30.05 8.45 8.45 89
5H 19 1635 31.1 40.6 9.5 31.1 40.75 9.65 9.65 102
6H 19 1725 40.6 50.1 9.5 40.6 50.40 9.80 9.80 103
7H 19 1820 50.1 59.6 9.5 50.1 59.84 9.74 9.74 103
8H 19 1905 59.6 69.1 9.5 59.6 69.40 9.80 9.80 103
9H 19 1955 69.1 78.3 9.2 69.1 78.35 9.25 9.25 101
10H 19 2115 78.3 84.8 6.5 78.3 86.13 7.83 7.83 120
11H 19 2205 84.8 94.3 9.5 84.8 94.79 9.99 9.99 105
12H 19 2255 94.3 103.8 9.5 94.3 104.16 9.86 9.86 104
13H 19 2345 103.8 113.3 9.5 103.8 114.21 10.41 10.41 110
14H 20 0055 113.3 122.8 9.5 113.3 123.26 9.96 9.96 105
15H 20 0145 122.8 132.3 9.5 122.8 132.78 9.98 9.98 105
16H 20 0240 132.3 141.8 9.5 132.3 142.51 10.21 10.21 107
Total advanced: 141.8 Total recovered: 152.83    
346-U1422E-
1H 20 0440 0.0 9.5 9.5 0.0 9.63 9.63 9.63 101
2H 20 0535 9.5 19.0 9.5 9.5 19.13 9.63 9.63 101
3H 20 0650 19.0 28.5 9.5 19.0 28.80 9.80 9.80 103
4H 20 0740 28.5 38.0 9.5 28.5 38.38 9.88 9.88 104
5H 20 0830 38.0 47.5 9.5 38.0 47.80 9.80 9.80 103
6H 20 0925 47.5 57.0 9.5 47.5 56.73 9.23 9.23 97
7H 20 1015 57.0 66.5 9.5 57.0 66.82 9.82 9.82 103
8H 20 1105 66.5 76.0 9.5 66.5 76.45 9.95 9.95 105
9H 20 1200 76.0 80.7 4.7 76.0 80.87 4.87 4.87 104
10H 20 1250 80.7 85.4 4.7 80.7 85.51 4.81 4.81 102
11H 20 1415 85.4 94.9 9.5 85.4 95.11 9.71 9.71 102
12H 20 1505 94.9 104.4 9.5 94.9 104.82 9.92 9.92 104
13H 20 1610 104.4 106.0 1.6 104.4 106.02 1.62 1.62 101
14H 20 1715 106.0 111.6 5.6 106.0 111.67 5.67 5.67 101
Total advanced: 111.6 Total recovered: 114.34    

DRF = drilling depth below rig floor, DSF = drilling depth below seafloor, CSF = core depth below seafloor. APC = advanced piston corer, XCB = extended core barrel, RCB = rotary core barrel. H = APC system. NA = not applicable.