Next Section |
Table of Contents
doi:10.2204/iodp.sp.302.2004
Figure F6. Primary paleoceanographic objectives can also be met by drilling in either Priority Contingency Area ( PCA) 4 at Site LORI-10A (lower panel) or in PCA5 at Site LORI-05A (upper panel). Geographic locations are shown in Figure F1.
Next Section |
Table of Contents
|