IODP

Next Section | Addendum Table of Contents | Master Table of Contents

doi:10.2204/iodp.sp.303306add.2005

Table T1. Proposed primary site operations for Expedition 306.
Site
Location
(lat/long)
Water depth (mbsl)
Operations description
Transit (days)
Drilling (days)
Logging (days)







Ponta Delgada

Sea Voyage from Ponta Delgada to IRD-3A: 416 nmi @ 10.0 kt
1.7


IRD-3A
(International)
41°0.068'N,
32°57.438'W
3426
3X APC to 300 mbsf. Drillover stuck core barrels. Tensor orientation on all APC cores.

6.4




Displace hole with mud; log with triple combo and FMS-sonic (2 passes each).


0.8



Transit from IRD3A to IRD-4A: 454 nmi @ 10.0 kt
1.9


IRD-4A
(International)
42°50.205'N
23°05.252'W
3542
3XAPC to 300 mbsf. Drillover stuck core barrels. Tensor orientation on all APC cores.

6.8




Transit from IRD-4A to LAB-8V: 1279 nmi @ 10.0 kt
5.3


LAB-8V
(Greenland)
58°29.513'N
46°25.751'W
2647
3XAPC to 300 mbsf. Drillover stuck core barrels to extend depth of APC. Tensor orientation on all APC cores.

5.5




Transit from LAB-8V to LAB-8X: 2.8 nmi @ 10.0 kt
0.3


LAB-8X
(Greenland)
58°27.602'N
46°29.714'W
2778
3XAPC to 300 mbsf. Drillover stuck core barrels to extend depth of APC. Tensor orientation on all APC cores.

5.9




Displace hole with mud; log with triple combo and FMS-sonic (2 passes each).


0.8



Transit from LAB-8X to Site 642: 1270 nmi @ 10.0 kt
5.3


Site 642
(Norway)
67°13.20'N
02°55.80'W
1288
Install reentry cone with 1 casing string and CORK thermistor.

4.8

Dublin


Sea Voyage from Site 642 to Dublin, Ireland: 910 nmi @ 10.0 kt
3.8





Subtotal:
18.3
29.4
1.6



Total operating days:
49.3









Notes: APC = advanced piston coring. FMS = Formation MicroScanner.

Next Section | Addendum Table of Contents | Master Table of Contents