Next Section |
Addendum Table of Contents |
Master Table of Contents
doi:10.2204/iodp.sp.303306add.2005
Table T1. Proposed primary site operations for Expedition 306.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Ponta Delgada
|
|
Sea Voyage from Ponta Delgada to IRD-3A: 416 nmi @ 10.0 kt
|
1.7
|
|
|
IRD-3A
(International)
|
41°0.068'N,
32°57.438'W
|
3426
|
3X APC to 300 mbsf. Drillover stuck core barrels. Tensor orientation on all APC cores.
|
|
6.4
|
|
|
|
|
Displace hole with mud; log with triple combo and FMS-sonic (2 passes each).
|
|
|
0.8
|
|
|
|
Transit from IRD3A to IRD-4A: 454 nmi @ 10.0 kt
|
1.9
|
|
|
IRD-4A
(International)
|
42°50.205'N
23°05.252'W
|
3542
|
3XAPC to 300 mbsf. Drillover stuck core barrels. Tensor orientation on all APC cores.
|
|
6.8
|
|
|
|
|
Transit from IRD-4A to LAB-8V: 1279 nmi @ 10.0 kt
|
5.3
|
|
|
LAB-8V
(Greenland)
|
58°29.513'N
46°25.751'W
|
2647
|
3XAPC to 300 mbsf. Drillover stuck core barrels to extend depth of APC. Tensor orientation on all APC cores.
|
|
5.5
|
|
|
|
|
Transit from LAB-8V to LAB-8X: 2.8 nmi @ 10.0 kt
|
0.3
|
|
|
LAB-8X
(Greenland)
|
58°27.602'N
46°29.714'W
|
2778
|
3XAPC to 300 mbsf. Drillover stuck core barrels to extend depth of APC. Tensor orientation on all APC cores.
|
|
5.9
|
|
|
|
|
Displace hole with mud; log with triple combo and FMS-sonic (2 passes each).
|
|
|
0.8
|
|
|
|
Transit from LAB-8X to Site 642: 1270 nmi @ 10.0 kt
|
5.3
|
|
|
Site 642
(Norway)
|
67°13.20'N
02°55.80'W
|
1288
|
Install reentry cone with 1 casing string and CORK thermistor.
|
|
4.8
|
|
Dublin
|
|
|
Sea Voyage from Site 642 to Dublin, Ireland: 910 nmi @ 10.0 kt
|
3.8
|
|
|
|
|
|
|
18.3
|
29.4
|
1.6
|
|
|
|
|
49.3
|
|
|
|
|
|
|
|
|
|
Notes: APC = advanced piston coring. FMS = Formation MicroScanner.
Next Section |
Addendum Table of Contents |
Master Table of Contents
|