Next Section |
Table of Contents
doi:10.2204/iodp.sp.308.2005
Table T6. T2P tapered probe measurement times.
|
|
|
Tool in pipe
|
0
|
0
|
Lower tool to 1 m above base of hole
|
45
|
45
|
Take hydrostatic pressure
|
5
|
50
|
Lower tool to base of hole
|
5
|
55
|
Stop pumping
|
5
|
60
|
Push tool into formation
|
5
|
65
|
Start pumping
|
5
|
70
|
Measure pressure
|
90
|
160
|
Pull tool from formation
|
5
|
165
|
Pull tool to top of pipe
|
25
|
190
|
Next Section |
Table of Contents
|