IODP

Next Section | Table of Contents

doi:10.2204/iodp.sp.308.2005

SITE SUMMARIES (CONTINUED)

Site: URS-1B
Priority:
Primary
Position:
28.07974007°N, 89.13930517°W
Water depth (m):
1057
Target drilling depth (mbsf):
612
Approved maximum penetration (mbsf):
612
Survey coverage:
  • Morgus HR line 150
  • Morgus HR trace 1100
  • Objectives:
    Hydrodynamic analysis of a passive margin. Ursa sites will test the flow-focusing model by drilling to 612 mbsf (20 m above the predicted top of the Blue Unit) in an overpressured region where overburden is thick (URS-1B) and where it is thinner (URS-2C, URS-3C).
    Drilling program:
    APC to refusal with drillover and XCB
    Wireline logging program:
    Triple combo, FMS-sonic, VSP
    MWD program:
    GVR, ADN, APWD
    Nature of rock anticipated:
    Hemipelagic mudstone with some interbedded levee sands

    Site: URS-2C
    Priority:
    Primary
    Position:
    28.09124346°N, 89.07252124°W
    Water depth (m):
    1262
    Target drilling depth (mbsf):
    358
    Approved maximum penetration (mbsf):
    358
    Survey coverage:
  • Morgus HR line 150
  • Morgus HR trace 2170
  • Objectives:
    Hydrodynamic analysis of a passive margin. Ursa sites will test the flow focusing model by drilling to 358 mbsf (20 m above the predicted top of the Blue Unit) in an overpressured region where overburden is thick (URS-1B) and where it is thinner (URS-2C, URS-3C).
    Drilling program:
    APC to refusal with drillover and XCB
    Wireline logging program:
    Triple combo, FMS-sonic, VSP
    MWD program:
    GVR, ADN, APWD
    Nature of rock anticipated:
    Hemipelagic mudstone with some interbedded levee sands

    Next Section | Table of Contents