Table T1. Location, depths, and basic program for the changed and added drilling sites (primary and contingency) for Stage 1 operations.
Proposed site | Location | Water depth (m) | TD (mbsf) | Program | |
---|---|---|---|---|---|
Latitude | Longitude | ||||
NT2-01D | 33°13.398′N | 136°42.140′E | 2346 | 1000 | Hole A - LWDHole B - HPCS/ESCSHole C - RCBCase to TD |
NT2-05A | 33°12.433′N | 136°43.867′E | 2839 | 275 | HPCS to TD |
NT2-10A | 33°12.830′N | 136°43.600′E | 2758 | 325 | HPCS to TD |
Note: TD = total depth, LWD = logging while drilling, HPCS = hydraulic piston corer system, ESCS = extended shoe coring system.