Table T1. Planned drill site details.
Hole |
Latitude, Longitude |
Seafloor depth |
Operations description |
Transit (days) |
Drilling/ Coring (days) |
Logging (days) |
|
---|---|---|---|---|---|---|---|
San Diego, California | Begin Expedition | 1 day port call | |||||
Transit ~1134 nmi to Hole U1301B @ 9.0 kt |
5.3 | ||||||
U1301B | 47.7538°N, 127.7638°W |
2667 | Hole U1301B - Lower end of pipe to/into reentry cone and pump cement into reentry cone - Flush drill pipe and offset to Hole 1301A |
2.5 | |||
U1301A | 47.7535°N, 127.7639°W |
2671 | Hole U1301A - Lower end of pipe to/into reentry cone and pump cement into reentry cone - Flush drill pipe and inspect cement job at both holes; recover drill string |
2.5 | |||
5.0 | |||||||
Transit ~181 nmi to Victoria, B.C. Canada @ 10.5 kt |
0.7 | ||||||
Victoria, B.C., Canada | End Expedition | 6.0 | 5.0 | 0.0 | |||
5.0 | |||||||
11.0 | |||||||
12.0 |