Previous   |   Close   |   Next

Figure F10. Operation plan (drilling sequence) at proposed Site NT1-07A in Shikoku Basin. See "Operations plan/drilling strategy" section for more detailed descriptions of drilling operations.

Previous   |   Close   |   Next  |   Top of page