Previous   |   Close   |   Next

Figure F3. Primary drill Site NT1-07A and contingency Site NT1-01A distributed along a transect from the prism toe (Sites C0006 and C0007, IODP Expedition 316) to the subducting basement high (proposed Site NT1-01A). The sites are shown overlain on IFREE 3-D seismic reflection Line 95 (uninterpreted depth section). VE = vertical exaggeration.

Previous   |   Close   |   Next  |   Top of page