Table T2. Planned operations and schedule, Expedition 337.
CSG = casing, ROV = remotely operated vehicle, BOP = blowout preventer, DOC = drill out cement, TD = total depth, POOH = pull out of hole. RCB = rotary core barrel, BHA = bottom-hole assembly. VSP = vertical seismic profile, LOT = leak-off test.
Previous | Close | Top of page