Previous   |    Close

Figure F8. Operations contingency plan, Expedition 338. Time required for operational segments, decision points, and decision point conditions as described in the legends. BOP = blowout preventer, LWD = logging while drilling, RWD = reaming while drilling.

Previous   |    Close   |    Top of page