Previous   |   Close   |   Next

Figure F3. General operations plan and time estimates. A. Proposed Site JFAST-3, Hole A. LWD = logging while drilling, MTL = miniature temperature logger. B. Proposed Site JFAST-3, Hole B. CORK = circulation obviation retrofit kit, PSU = pressure sensor unit.

Previous   |   Close   |   Next  |  Top of page