Previous   |   Close   |   Next

Figure F6. Pressure and thermistor string strap-CORK observatory planned for installation at proposed Site JFAST-3, Hole B. ROV = remotely operated vehicle, WH = wellhead, CSG = casing, OH = open hole, MTL = miniature temperature logger, CAM = cam actuated running tool, CORK = circulation obivation retrofit kit, HGR = hanger, TBG = tubing.

Previous   |   Close   |   Next  |  Top of page