Close   |    Next

Table T1. Expedition 344 operations plan, primary sites.

EPSP = Environmental Protection and Safety Panel, APC = advanced piston corer, APCT-3 = advanced piston coring temperature tool, SET = sediment temperature tool, RCB = rotary core barrel, FMS-sonic = Formation MicroScanner sonic tool string, VSI = Versatile Seismic Imager.

Close   |    Next   |    Top of page