Table T1. Expedition 344 operations plan, primary sites.
EPSP = Environmental Protection and Safety Panel, APC = advanced piston corer, APCT-3 = advanced piston coring temperature tool, SET = sediment temperature tool, RCB = rotary core barrel, FMS-sonic = Formation MicroScanner sonic tool string, VSI = Versatile Seismic Imager.
Close | Next | Top of page