Table T2. Expedition 346 Asian Monsoon (Proposal P605-Full 2) final operations plan summary, optimized for 61 days.
EPSP = Environmental Protection and Safety Panel. APC = advanced piston corer, XCB = extended core barrel, APCT3 = advanced piston corer temperature tool, triple combo = triple combination tool string, FMS-sonic = Formation MicroScanner-sonic tool string.
Previous | Close | Top of page