Close   |    Next

Figure AF1. Bathymetry with location of proposed Site IBM-4GT (red star). Blue multichannel seismic (MCS) Lines IBM4-NS5 and IBM4-EW5 were obtained during Cruise KR08-09 in 2008. Black MCS lines were also acquired during this cruise.

Close   |    Next   |    Top of page