Table T3. Operations plan for alternate proposed site, Expedition 355.
EPSP = Environmental Protection and Safety Panel. APC = advanced piston corer, XCB = extended core barrel, RCB = rotary core barrel, APCT-3 = advanced piston corer temperature tool, triple combo = triple combination, FMS = Formation MicroScanner, WL = wireline, VSI = Versatile Seismic Imager.
Previous | Close | Top of page