Previous   |    Close

Table T3. Operations plan for alternate proposed site, Expedition 355.

Expedition 355 Arabian Sea Monsoon operations plan for alternate proposed site.

EPSP = Environmental Protection and Safety Panel. APC = advanced piston corer, XCB = extended core barrel, RCB = rotary core barrel, APCT-3 = advanced piston corer temperature tool, triple combo = triple combination, FMS = Formation MicroScanner, WL = wireline, VSI = Versatile Seismic Imager.

Previous   |    Close   |    Top of page