Table T18. T2P Deployment 19, Hole U1322B.
| Event | Time (GMT) |
Description |
|---|---|---|
| 1 | Data logger started at 1 Hz | |
| 2 | 12:30:53 | Start lowering T2P downhole, pumps on |
| 3 | 12:36:29 | Stop at 491 mbsl, pumps off |
| 4 | 12:38:38 | Start lowering probe |
| 5 | 12:44:32 | Stop at 741 mbsl, pumps off |
| 6 | 12:46:30 | Start lowering probe |
| 7 | 13:03:56 | Stop at 1321 mbsl, pumps off |
| 8 | 13:07:17 | Start lowering probe |
| 9 | 13:34:36 | Stop at 1443 mbsl, pumps off |
| 10 | 13:36:23 | Start lowering probe |
| 11 | 13:41:16 | CDS lands in BHA; pumps off |
| 12 | 13:52:56 | Start penetration of T2P into sediment |
| 13 | 13:54:18 | End of T2P penetration; bit on bottom of hole |
| 14 | 13:54:18 | Raising BHA 4.0 m off bottom of hole |
| 15 | 14:25:47 | Pulling T2P uphole slowly with wireline |
| 16 | 14:29:38 | Stop at 1321 mbsl, pumps off |
| 17 | 14:31:25 | Pulling T2P uphole slowly with wireline |
| 18 | 14:40:06 | Stop at 741 mbsl, pumps off |
| 19 | 14:41:40 | Pulling T2P uphole slowly with wireline |
| 20 | 14:46:08 | Stop at 491 mbsl, pumps off |
| 21 | 14:47:40 | Pulling T2P uphole slowly with wireline |
| 22 | Data downloaded from data logger |
Notes: Depth = 134.3 mbsf. Date = 29 June 2005. T2P = temperature/dual pressure probe. CDS = colleted delivery system. BHA = bottom-hole assembly.
Previous | Close | Next | Top of page