Table T21. T2P Deployment 22, Hole U1322C.
| Event | Time (GMT) |
Description |
|---|---|---|
| 1 | Data logger started at 1 Hz | |
| 2 | 22:18:46 | Start lowering T2P downhole, pumps on |
| 3 | 22:29:40 | Stop at 491 mbsl, pumps off |
| 4 | 22:31:51 | Start lowering probe |
| 5 | 22:35:38 | Stop at 741 mbsl, pumps off |
| 6 | 22:37:41 | Start lowering probe |
| 7 | 22:45:54 | Stop at 1321 mbsl, pumps off |
| 8 | 22:48:16 | Start lowering probe |
| 9 | 22:51:43 | Stop at 1384 mbsl, pumps off |
| 10 | 22:54:50 | Start lowering probe |
| 11 | 22:59:47 | CDS lands in BHA; pumps off |
| 12 | 22:59:57 | Start penetration of T2P into sediment |
| 13 | 23:00:52 | End of T2P penetration; bit on bottom of hole |
| 14 | 23:01:10 | Raising BHA 4.0 m off bottom of hole |
| 15 | 00:03:25 | Pulling T2P uphole slowly with wireline |
| 16 | 00:06:30 | Stop at 1321 mbsl, pumps off |
| 17 | 00:08:30 | Pulling T2P uphole slowly with wireline |
| 18 | 00:15:04 | Stop at 741 mbsl, pumps off |
| 19 | 00:17:14 | Pulling T2P uphole slowly with wireline |
| 20 | 00:20:20 | Stop at 491 mbsl, pumps off |
| 21 | 00:22:30 | Pulling T2P uphole slowly with wireline |
| 22 | 00:29:40 | Wireline disconnected from CDS |
| 23 | 00:31:25 | CDS/spacer disconnected from spacer |
| 24 | 00:32:42 | T2P out of pipe |
| 25 | Data downloaded from data logger |
Notes: Depth = 75.0 mbsf. Date = 30 June 2005. T2P = temperature/dual pressure probe. CDS = colleted delivery system. BHA = bottom-hole assembly.
Previous | Close | Next | Top of page