Table T23. Event summary of T2P Deployment 11, Hole U1324B.
| Event | Time (GMT) |
Event |
|---|---|---|
| 1 | 12:02:00 | Data logger started at 1 Hz |
| 2 | 12:18:13 | T2P on rig floor |
| 3 | 12:31:55 | Start lowering T2P downhole, pumps on |
| 4 | 12:42:00 | Stop at 1068 mbsl, pumps off |
| 5 | 12:45:46 | Start lowering probe |
| 6 | 12:50:23 | Stop at 1510 mbsl, pumps off |
| 7 | 12:56:38 | Start lowering probe |
| 8 | 12:58:11 | CDS lands in BHA; pumps off |
| 9 | 13:14:02 | Pulling T2P uphole slowly with wireline |
| 10 | 13:25:02 | Stop at 1067 mbsl, pumps off |
| 11 | 13:28:02 | Pulling T2P uphole slowly with wireline |
| 12 | 13:34:27 | Wireline disconnected from CDS |
| 13 | 13:38:21 | CDS disconnected from spacer |
| 14 | 13:40:15 | Spacer disconnected from CDS |
| 15 | 13:46:40 | T2P out of pipe |
| 16 | 14:10:36 | Data downloaded from data logger |
Notes: Depth = 593.2 mbsf. Date = 25 June 2005. T2P = temperature/dual pressure probe. CDS = colleted delivery system. BHA = bottom-hole assembly. GMT = Greenwich Mean Time.
Previous | Close | Next | Top of page