Table T25. Event summary of T2P Deployment 13, Hole U1324C.
| Event | Time (GMT) |
Event |
|---|---|---|
| 1 | 14:42:47 | Data logger started at 1 Hz |
| 2 | 16:18:30 | T2P on rig floor |
| 3 | 16:28:42 | Start lowering T2P downhole, pumps on |
| 4 | 16:44:22 | Stop at 741 mbsl, pumps off |
| 5 | 16:46:30 | Start lowering probe |
| 6 | 16:52:33 | Stop at 1057 mbsl, pumps off |
| 7 | 16:54:39 | Start lowering probe |
| 8 | 17:03:38 | CDS lands in BHA; pumps off |
| 9 | 17:04:34 | Start penetration of T2P into sediment |
| 10 | 17:05:22 | End of T2P penetration; bit 1 m off bottom of hole |
| 11 | 17:06:00 | Raising BHA 2 m off bottom of hole |
| 12 | 18:08:10 | Pulling T2P uphole slowly with wireline |
| 13 | 18:11:22 | Stop at 1057 mbsl, pumps off |
| 14 | 18:13:30 | Pulling T2P uphole slowly with wireline |
| 15 | 18:17:18 | Stop at 741 mbsl, pumps off |
| 16 | 18:19:36 | Pulling T2P uphole slowly with wireline |
| 17 | 18:22:53 | Stop at 491 mbsl, pumps off |
| 18 | 18:24:29 | Pulling T2P uphole slowly with wireline |
| 19 | 18:30:32 | Wireline disconnected from CDS |
| 20 | 18:34:39 | CDS disconnected from spacer |
| 21 | 18:36:28 | Spacer disconnected from CDS |
| 22 | 18:36:28 | T2P out of pipe |
| 23 | Data downloaded from data logger |
Notes: Depth = 100.0 mbsf. Date = 26 June 2005. T2P = temperature/dual pressure probe. CDS = colleted delivery system. BHA = bottom-hole assembly. GMT = Greenwich Mean Time.