• Chapter contents
  • Abstract
  • Introduction
  • Overview of the NanTroSEIZE complex drilling project
  • Background
    • Geological setting
    • Previous drilling achievements
    • Seismic studies/site survey data
  • Sites C0011 and C0012
    • Scientific objectives
  • NanTroSLIDE Ancillary Project Letter
    • Scientific objectives
    • Drilling strategy
  • Principal results
    • Site C0018
    • Site C0011
    • Site C0012
  • Preliminary scientific assessment
  • References
  • Figures
    • F1. Bathymetric map.
    • F2. Spliced composite profile.
    • F3. Detailed bathymetry, Site C0018.
    • F4. Sedimentary log, Hole C0018A.
    • F5. Equal-area projections, Hole C0018A.
    • F6. Physical properties, Site C0018.
    • F7. Lithology on seismic background, Site C0018.
    • F8. APCT-3 measurements.
    • F9. Map of Kashinosaki Knoll and Nankai Trough.
    • F10. Lithology on seismic background, Sites C0011 and C0012.
    • F11. Major element oxides, Site C0011.
    • F12. Age-depth curves.
    • F13. Stratigraphic correlation between Sites C0011 and C0012.
    • F14. Major element oxides, Site C0012.
    • F15. Bedding dip angles, Holes C0012C and C0012D.
    • F16. Porosity data, Site C0011 and C0012.
    • F17. P-wave velocity.
    • F18. Hydrocarbons, Holes C0012C, C0012D, and C0012E.
    • F19. Carbon and sulfur, Holes C0012C, C0012D, and C0012E.
  • PDF file